Chinese
National hotline: 13526708333
News information
Contact usContact us
National hotline 13526708333

Medium and thick mechanical equipment

Company address: Zhengzhou Xingyang City G310 machinery equipment Industrial Park

Contact number: 400-0371-805

Company email: 80113938@qq.com

Your location: Home page>> News information
News information

Use method of mud and stone separator after purchase

Author: Release time: 2023-09-25 17:56:00 Click: 399

Summary of information:

The equipment should be fixed on the special foundation and fixed by the embedded bolt. After the new screen machine is installed, it should be checked according to the following requirements:

The equipment should be fixed on the special foundation, fixed by the embedded bolt, after the new screen machine installed, should be checked according to the following requirements: 1, close the power switch, confirm that the motor synchronous reverse rotation, 10-20 minutes of empty operation, equipment in operation if there is abnormal sound, should be quickly shut down for inspection. After the equipment is in normal operation, a small amount of material to be screened can be put into the screening machine through the feed port, confirm that the material is moving in the direction of the discharge port, and then gradually increase to the required and can withstand the feed amount. 2. When screening materials, the materials should be evenly put into the feed port to ensure the uniform distribution of materials on the screen surface. When the material falls, there should be no big impact to avoid damage. 3, boot steps: first open the mud separator, after the speed is adjusted to a better speed, then open the feeder, belt conveyor. 4, the user can increase or decrease the speed of the screening machine according to the gap of the screening machine and the specific gravity of the material, so that the screening machine can achieve a good screening effect. 5, stop steps: ① first stop feeding and turn off the feeder. ② When the material on the conveyor surface of the mud and stone separator is finished, the mud and stone separator is closed (otherwise, the card machine will appear in the next opening, causing the machine stage to not run). 6. The bearing seat should be regularly added with butter before the new machine is turned on, and it should be checked once a day after normal production, and there should be no shortage of oil. 7, bearing seat screws are easy to loose parts, to be imprisoned before starting, so as not to loose. 8, the reducer should be filled with lubricating oil before starting, and check regularly. 9, the chain sprocket normal maintenance, work 3-5 days a small amount of brush oil (oil). 10, the electronic control system should have a special person responsible, the personnel should be away from the machine 5 meters before the boot, and then start the work after no one is confirmed. 11, shutdown, repair, maintenance during the main power switch must be turned off to ensure safety. Special reminder: Before the equipment is switched on and off, there should be no retained materials on the screen surface, which should be checked frequently, and non-staff should stay away.


Online customer service
Contact information

Hot line

13526708333

Working time

Monday to Friday

Company telephone

400-0371-805

Two-dimensional code
in line The guest clothing