Collect
Check out my collection
0 Useful +1
0

Zhangcheng Expressway

Highways in China
Zhangcheng Expressway is 375 km long, passing Zhangjiakou, Chongli, Guyuan, Datan, Fengning to Chengde. Chengde section starts from Chengchi Expressway Shantazi interconnecting, west through Hongqi, Erdaohe, Taipingzhuang, Fengshan, Xuanjiangying, Tuchengzi, Lamashan, Qiumangou, Hujiayingzi, at Datan and Zhangjiakou Zhangjiakou section of Zhangcheng Expressway connecting, 203.583 km long, design speed 100 km. According to the plan, the section from Fengning to Zhangchengjie (more than 70 kilometers) will be completed in 2015, and the section from Chengde to Fengning (130 kilometers) will be completed in 2016. The 367-kilometer-long Zhangcheng Expressway opened to traffic on December 30, 2015.
Chinese name
Zhangcheng Expressway
Total mileage
367 km
exit
6 (opened)
Service area
2 (opened)
Opening time
The line opened to traffic on December 30, 2015

Zhangjiakou section

broadcast
EDITOR

General situation

Zhangcheng Expressway
On the morning of April 26, 2007, the foundation stone was laid for the Zhangjiakou to Chongli section of Zhangcheng Expressway in Hebei Province.
Zhangjiakou to Chongli section of Zhangcheng Expressway is not only a part of the expressway network layout in Hebei Province, but also one of the expressway trunk lines in Zhangjiakou City. The starting point of the route is located near Taishiwan Village, Xuanhua County, the new interchange is connected with Danla Expressway, and the north is wired along the east side of the planning area of Zhangjiakou City, through Xiaoxinzhuang and Dongyaoki of Kouli City, through the long tunnel through Dahualing, through Liutiao Ditch, Lower Yushu Ridge, Toudaoying to Chongli County, the total length of the route is 62 kilometers, and the design speed is 80 km/h. There are 6 interchanges, 3 separate interchanges, 53 Dazhong Bridges and 8 separate tunnels, with a total length of 15 kilometers. The total estimated investment of the project is 3.772 billion yuan.
The construction of Zhangcheng Expressway marks a new step in the construction of Zhangjiakou expressway. After the opening of Beijing-Zhang Expressway and Xuanda expressway, Zhangcheng Expressway will become another important road in the history of road construction in Zhangjiakou. It will play an important role in solving the problem of Zhangjiakou connecting Northeast China and coastal expressway. Promoting the coordinated development of regional economy will play a very important role.
The construction of Zhangjiakou to Chongli section of Zhangjiakou Expressway can improve the road network structure and traffic conditions of Zhangjiakou city, stimulate the tourism and economic development along the expressway, play the role of "east to west" in Zhangjiakou City, and accelerate the economic development of Zhangjiakou city.

Be open to traffic

On September 28, 2010, the Zhangjiakou to Chongli section of Zhangcheng Expressway was completed and opened to traffic in Hebei Province.
The project is an important part of the highway network layout of Hebei Province "five vertical, six horizontal and seven lines". The starting point of the project is connected with the Beijing-Tibet Expressway and goes north through Xiaoxinzhuang and Kouli Dongyao Village Through the Dahualing Special tunnel, along the big south Ditch, the new camp, the lower Elm forest, the first road camp to the end Chongli county North of the city. The route is 62 km long. Two-way four-lane highway standard construction, design speed of 80 km/h. There are 6 interchanges, 3 separate interchanges, 42 Bridges and 4 separate tunnels. There are 2 service areas, 1 maintenance area and 1 management office. At the same time, in order to promote the development of Chongli County's summer summer, winter skiing and other tourism projects, the special three ski resort connection lines of Saibei, Wanlong and Changcheng Ling, with a total length of 46.9 kilometers.
The completion and opening of the first phase of Zhangcheng Expressway will connect Beijing-Tibet Expressway, Zhangshi Expressway and Zhangcheng Expressway to form a large outer ring of Zhangjiakou urban expressway, which is of great significance for improving the road network structure of Zhangjiakou city, reducing the road traffic pressure in the main urban area, promoting the development of eco-tourism along the route, and accelerating the sound and rapid development of regional economy and society. It is a veritable ecological road, tourist road and landscape road.

exit

mileage
name
join
Entrance direction
0
Taishi Bay (starting point)
G6 Beijing-Tibet Expressway (Danla) Beijing, Hohhot direction
Chengde
7
Zhangjiakou service area
-
-
10
Zhangjiakou south Wei three road
Weisan Road, East Ring, Yaojiazhuang Town, Zhangjiakou Airport
Beijing-tibet Expressway, Chengde
16
Zhangjiakou Five road
Wuyi East Street, North Ring, Qiaoxi District, Zhangjiakou Station
Beijing-tibet Expressway, Chengde
35
Put Tuwan Zhang sell line
Chang Village, Bantuwan Village, S242
Zhangjiakou
52
Chongli Service Area (Chengde direction)
-
-
54
Chongli Service Area (Zhangjiakou direction)
-
-
55
Sungnyemnam
X410, Chongli County, S242
Zhangjiakou
62
Sungneli North
S242, East Malaysia Line
Zhangjiakou, Chengde (suspended)

General situation

On October 28, 2011, the construction of Chongli to Zhangchengjie section of the second phase of Zhangcheng Expressway officially began, and it is expected to be completed and opened to traffic in 2014.
The Zhangjiakou to Chongli section of the first phase of Zhangcheng Expressway was completed and opened to traffic at the end of September 2010. The Zhangcheng Expressway Phase II Chongli to Zhangchengjie section project, the starting point is located in the Chongli North interchange of the end point of Zhangcheng Expressway phase I, the route goes north through Taiping Zhuang and Baiqi, crosses the Nanchi Highway in the west of Nanshanyao village, turns northeast in Shizigou Town, passes Dadonggou and Qingwuying, crosses Huapili Ridge in Dadonggou, reaches Bashang, and then goes north through Tiger Ditch, Naobo Mountain and Hanqing Dam. After turning east at Dongtan to cross the Hulu River, cross Baoping Road at Xiaonan Ying North, and reach the end of the project at the North Zhangcheng junction of Xiaonan 2 Village. The route is 101.807 km long. There are four interchanges and four connecting lines, with a total length of 54.1 kilometers. This section of the road uses two-way four-lane construction, the design speed of 80 km/h. The construction of the project is of great significance to improving the highway network structure of Hebei Province, strengthening the connection between Zhangcheng and Zhangcheng, promoting the development of resources and tourism in the two cities of Zhangcheng, accelerating the eradication of poverty in Bashang and promoting the harmonious development of regional economy. [1]

progress

On March 28, 2013, Zhangcheng Expressway Chongli to Zhangcheng Jie section land expropriation demolition and engineering construction mobilization meeting was held in Chongli. Party members, Deputy Director Pan Xiaodong, Zhangjiakou City government vice Mayor Song Wenling attended the meeting and spoke.
Pan Xiaodong stressed that this conference marks the official start of the construction of the second phase of Zhangcheng Expressway project, and all levels of departments should cherish the opportunity, cherish the honor and cherish the position, and play their respective functions in the construction of the project. In the construction of the project, one is to unify the thinking, gather strength, and fight the overall battle of the relocation work. We will create a sound government, social, security and public security environment. The second is to focus on the goal, joint management, to ensure that there is no safety and quality accidents. The third is to strict standards, strict processes, to ensure that construction standardization is implemented. Fourth, we must comprehensively promote the "ten openness" and strengthen the construction of clean government. [2]
In view of the relocation work of the whole line, Song Wenling said that the relevant county governments and relevant units should work together with a high sense of historical mission and a strong sense of responsibility to overcome difficulties and successfully complete the relocation task of the second phase of the Zhangcheng high-speed.
At 9:56 am on April 27, 2013, the Huapiling Tunnel of Chongli to Zhangchengjie section of Zhangcheng Expressway broke ground, marking the start of the control project of the entire Zhangcheng Expressway.
Huapiling Tunnel is located in Shuiquanwa Village, Zhanhai Township, Zhangbei County, Hebei Province. The tunnel, with a total length of 3,000 meters in both directions, is built by China Railway 11th First Group, the largest control project of the whole line. The climate here is cold, and the effective period is only 15 to 18 months.
In order to fight for the early start of the tunnel, the leadership of the management office ran around, worked hard day and night, fully supported and coordinated, and the leaders of Zhangbei County and Zhanhai Township also gave active support and cooperation. The project department has carried out a lot of preparatory work in the aspects of site coordination, commencement procedures, materials and equipment, construction personnel, and technical testing. This groundbreaking marks the formal entry of the construction phase of Huapiling Tunnel.
On the morning of April 28, 2013, the construction of Guyuan section of Zhangcheng Expressway, a key project of traffic construction, started in a festive and warm atmosphere. At the Changliang Shili Mountain construction site, saluted guns, colored flags flew, and several machines started motors Work together Presenting a scene of hectic activity. It is reported that the Guyuan section of Zhangcheng Expressway is an integral part of the highway network layout in Hebei Province, and it is also one of the main trunk lines of the highway network construction in Guyuan County. The starting point of the route is located near Xiba Village, Lianhuatan Township, through Xixinying Township, Xiaozi Township, Pingdingbao Township, to Shishishan village, Changliang Township, with a total length of 54.3697 km and a design speed of 80 km/h. In the whole process, a total of 2 service areas are built, 1 high connection high interchange, and 2 exit interchange, respectively, Xiaonanying exit interchange, Dongxinying exit interchange, and a tunnel of 438 meters. A total of 36 large, medium and small Bridges, 5 separate interchange, 7 flyovers, 5 access Bridges, 2 ramp crossing Bridges, and 95 culvert passages were built. The total investment of the project is about 4.5 billion yuan, and the construction period is expected to be three years.
According to the person in charge of the project, the project owner is Hebei Expressway Administration Bureau The executive owner is Zhangcheng Zhangjiakou Management Office of Hebei Expressway. Guyuan section involves four bidding sections, which are respectively D bid, and CCCC 1 Public bridge and tunnel Company won the bid; E symbol, Xingtai Road and bridge construction Corporation Win the bid; F bid, Hebei Guangtong Road and Bridge Engineering Co., Ltd. won the bid; G bid, China Railway No. 5 won the bid.
The construction of Guyuan section of Zhangcheng Expressway will play a very important role in improving the road network structure and traffic conditions of the county, stimulating the tourism and economic development along the expressway, and accelerating the county's economic leap-over and green rise. [3]
"High quality and high efficiency, ecological and environmental protection". In Zhangjiakou section of Zhangcheng Expressway Chongli to Zhangchengjie section, these eight words are constantly manifested in practice. Since the construction of Zhangcheng Expressway Phase II officially opened on March 28, 2013, in a short period of three months, it has taken solid steps in the construction of the station, the main project, ecological environmental protection, benefiting the people and other aspects, creating a harmonious atmosphere between man and nature and between people.
Engineering construction: Standard construction road
Along the construction road, the construction site is very beautiful under the blue sky and white clouds. Zhangcheng high-speed Zhangjiakou management Office Director Yu Hai introduced to reporters, the tall machinery called dynamic compaction machine, mainly used for half-filled half-dug section of the foundation dynamic compaction, the machinery is digging pile holes, the machinery is rolling before filling... Walking on the road, much better than the imagined road, like walking on a small oil road through the village. Yu Hai said that this road is built according to standardization, and unqualified ones are not accepted. Stop at a construction site for the foundation of the passageway, where workers are installing formwork, surrounded by steel pipes and mesh to form a barrier Reflective material . There are several bulletin boards on the side, clearly writing the name of the structure, the structure, the person in charge of the construction, the supervisor and so on.
Yu Hai said that construction standardization is the concept of engineering construction, and it is a good starting point. Whether the project is done well or not, the key depends on the determination and strength of standardization. The management office seized the favorable opportunity of the construction unit to carry out standardized training, brainwashed the management personnel of the construction unit and the first-line construction personnel, trained the exam, and fundamentally changed the past kind of extensive construction consciousness. At first, it may not be suitable, but after practice, standardized construction has really improved efficiency, and the three words "standardization" of the construction personnel of the whole line have entered the heart and brain.
The C standard project department is located at the foot of the mountain, the electric gate, the courtyard surface is hardened, several rows of brick and wood structure houses are offices and staff dormitories of various departments and rooms, and next to the north and south is a big conference of color steel plate. Li Jun, the project manager, said that this was a dilapidated village committee and primary school, and after we withdrew, all were left for the villagers to continue to use. According to the standardization requirements, the facilities of the project department have standards, such as there must be a staff bathroom, a flushing toilet and so on. Standardization has given dignity to front-line construction workers, and they are no longer boondoggone after work.
It is understood that the whole line of 7 project departments, 4 resident offices, 1 director office is mostly the use of the local old primary school, the old village committee, the warehouse reconstruction, there is no new occupation of one mu of farmland, in the standardization of the resident at the same time, equal to the construction of several "hope primary school" and "villagers' activity center" in the local.
Yu Hai introduced that the entire line of single projects are the implementation of the first project acceptance system, the establishment of standards, norms and regulations, summing up experience, before allowing large-scale construction, resolutely not to sacrifice the quality of the project to speed up the progress of the project.
Protection of green: ecological road
Most of the Zhangcheng Expressway is located in the transition zone of Bashang Plateau, with serious desertification and very dry surface covered with a layer of floating soil. When the wind blows, dust fills the sky, and a cloud of dust flies in the wind where the machine passes. Every day, 3-4 sprinklers should be sent for special road maintenance to prevent dust.
The management office requires that the construction team should take environmental protection as the focus of the project when entering the field, emphasizing that the cost of the project should not be reduced at the expense of the ecological environment. Before the builder designed for greening funds of 1-2 yuan m2, can not meet the requirements of environmental protection. Considering the fragile vegetation in Zhangjiakou, it is difficult to recover once damaged. The management office will change the capital investment for greening to more than 20 yuan m2. Through the Guyuan wetland section of the original design is 900 meters of roadbed, in order to protect the wetlands, determined to bridge through, only one increase investment 59 million yuan.
In the second phase of construction, Zhang Cheng pays special attention to the construction of border protection and greening. Pay particular attention to avoid digging and filling, the designed tunnel is not like the traditional tunnel from the side of the mountain, but more close to the foot of the mountain, into the hole, so that early into the late natural into the hole, to avoid digging and filling, protect the mountain. Taking into account the fragile ecological environment along the way, if filling and digging are encountered during the construction, the original appearance will be restored as far as possible after the repair to protect it Primary vegetation . A subgrade material is more difficult, they use their brains, with clear topsoil to replace the villagers gravel, both fill the subgrade, but also to the villagers to create land, to achieve a win-win situation.
In the B standard project department, I saw a small piece of land, and the plants inside were lush and lush. Ouyang Shan, project manager of B standard, said that this is a green belt cultivated with clear topsoil. Unlike in the past, all the clear topsoil in Zhangcheng Phase II was not discarded, but piled together. The clear topsoil is mainly humic soil, which is used for highway slope greening and wasteland land construction. In addition, the Hua PI Ling Tunnel, which just broke ground in April, will make full use of waste slag to build a viewing platform.
It is understood that the second phase of the Zhangcheng plan will build two viewing platforms, one built in the "Jiuzhaigou Valley" known as the Birch Ridge, its main peak up to 2188 meters above sea level, is the first peak on the dam, mountains rolling, mountains rolling. This viewing platform is set up at the exit of the tunnel, offering a picturesque view. The other place is set in Wuhua Meadow. There are many kinds of plants in Wuhua Meadow. At different times, there are different flowers for this meadow, which is named after the five colors of flowers blooming in full bloom in midsummer. The setting of the observation platform is fully combined with the tourism resources with great development prospects along the way, highlighting the harmony between man and nature.
Benefiting the people: The road from poverty to prosperity
The route from Chongli to Chengde has sharp bends. The staff explained: "The reason for this design is mainly because there are fewer towns along the straight line. The curve through Chongli, Zhangbei, Guyuan three counties are national-level poor counties, in each township have left exports, can effectively pull the Bashang area out of poverty."
Bashang area year-round low temperature, farmers planted off-season vegetables are very popular, every year will be exported to Japan, South Korea in large quantities. "The temperature here is low, the cabbage produced in June and July, no pests, grow well!" Yin Yong, a farmer who lives in a den, said proudly that he planted 13 acres of land, mainly planting beans, cauliflower, cabbage. Talking about income he shook his head helplessly, the market of vegetables is unstable every year, can only rely on the day to eat. It is understood that there are many farmers like Yin Yong, and they are looking forward to the builders of Zhangcheng Expressway to open up a way for them to get rid of poverty and get rich.
Due to the scarcity of land resources, builders occupy as little farmland as possible when designing routes, and most of them walk on barren hills and slopes. Moreover, the poor land resources of Zhangjiakou are also fully considered in the construction of the project, and most of the clear topsoil will be covered on the abandoned slag, transforming the wasteland and creating land for the people. Preliminary statistics, the second phase of the project will use the earth site, abandoned soil site to create about 2000 mu of land.
Zhangcheng Phase II provides convenient traffic conditions for the development of tourism along the way, through Chongli, Zhangbei, Guyuan three counties tourism resources are very rich. The Lightning River, which has nourished the Bashang grassland like a mother for thousands of years, is only 20 kilometers away from Zhangcheng Phase II. Every summer, Bashang grassland sky blue cloud white, birds and flowers, is a summer resort. In winter, the unique scenery is a paradise for ski lovers, located in Chongli Wanlong Ski Resort is currently North China's largest, closest to Beijing, the most complete service facilities of the natural ski resort.
Joint design: High quality and efficient road
Spring came particularly late in Bashang in 2013, and the weather has been bad since the official construction began on March 28. In April, the spring cold is even more snowy, the temperature is cold, until the middle of May to thaw. The builders of Zhang Cheng who are not afraid of hardship face up to the difficulties and overcome the adversity, so that the preliminary project can be carried out smoothly. Up to now, the Zhangcheng Phase II project has completed a total investment of 850 million yuan. The project department, mixing station, prefabrication yard and other temporary construction have all been completed, and the roadbed engineering and table cleaning work are progressing smoothly.
In order to achieve the goal of high quality and efficiency, the four units of construction, owner, supervision and design carried out joint design. From the joint design at the beginning of the approach to the dynamic design at the back, making up for the shortcomings and defects in the design will carry out the whole process of construction.
According to Guo Jingde, director of the chief engineering Office, a total of 168 culverts and channels are set up in the second phase of the Zhangcheng project. Due to the fact that the winter is more than 30 degrees below zero and the groundwater level is relatively high, in the joint design stage, the management office fully considers the antifreeze requirements of the culvert foundation, carries out the antifreeze change design of the structural foundation, and sets the buried depth of the foundation at 30 cm below the freeze line to ensure the safety of the structure during the freeze-thaw period.
In Section B, there is a fish pond with a spring in it, which is the source of the Qingshui River. The nearby villagers were very worried when they heard that the roadbed of Zhang Cheng II would occupy the fish pond. The spring water of this fish pond is to supply drinking water and farmland irrigation water for more than 3,000 people in 4 villages in Chongli County and 2 villages in Akicheng County across the mountain through diversion tunnels. The pressure of the fish pond is bound to pollute drinking water sources, and even block the spring channel, resulting in water cut off in 6 villages. After the management office understood, through field investigation and joint design, the original design was adjusted, and the structure was set up according to the layout of the spring to protect the water source.
The construction environment is harsh, the climate is cold and dry, and the terrain drop is as high as 600 meters; The effective construction period is short and the construction period is tight...... The difficulties of Zhangcheng second phase construction are numerous. Overtime is a common occurrence for builders, most of whom return home only once a week. Because the project has just started, there are too many things to learn and master, and the management department requires overtime work from 7:30 to 9 p.m. every night, and also sends a special person to check the guard, which is nicknamed "evening self-study".
However, the builders did not complain too much, holding the spirit of "the pursuit of excellence, willing to contribute, striving for success, and bravely creating first-class", they silently pushed forward the construction progress, and painted the beauty of traffic on the beautiful dam. [4]

Connecting line

broadcast
EDITOR
Construction of the connecting line between Zhangcheng Expressway and Grassland Tianlu began [5]
Recently (June 13, 2015), Grassland Tianlu and Zhangcheng (Zhangjiakou to Chengde) expressway connection line project (also known as Grassland Tianlu, Olympic Yingbin Avenue) in Zhangbei County Zhanhai Township started construction. As the fastest passage between Grassland Tianlu and Zhangcheng Expressway, the link is 1.3 km long and the whole project is expected to be completed and opened to traffic in 2015. [6]
"Grassland Heaven Road" is one of the ten most beautiful highways in northern China. Professor Wang Juying, an expert in the study of grassland Tianlu, said: The east of Grassland Tianlu is connected to Zhuolu County, the origin of five thousand years of Chinese civilization Yellow Emperor City In the west, Zhangjiakou, the hometown of Oriental human beings Yangyuan county Nihewan, north of the Silk Road in northern China - Zhangku Avenue, Yuanzhong capital, she is the link between China's farming civilization and grassland culture, but also the northern people to take the west of the entrepreneurial road. Grassland heaven road to the Chinese nation, like a mirror; She symbolizes the arduous journey of the great Chinese nation. Therefore, grassland Heaven Road should be called the "mother road" of the Chinese nation, and not completely equivalent to the American-style Route 66.
"Prairie Road" is located Zhangjiakou City Within the territory, its dam mark area with a total length of 132.7 kilometers, an investment of 320 million yuan, was completed and opened to traffic at the end of September 2012, and is an important channel connecting Chongli County Olympic ski resort, Sai-outside scenic spot and Zhangbei grassland style area. "Grassland Heaven Road" along the winding, rivers, mountains, deep gully, meadow cattle and sheep, the landscape is extraordinary, showing a hundred li Bastou landscape picture, distribution of the ancient Great Wall site, Huapi Ridge, Tianquan cave (Zhangbei County, Zhanhai Township, a Butai ditch), the air grassland flying beach, Baihua slope, rock mountain, wild fox Ridge and many other human, ecological and Geological tourism resources . Because of its unique natural resources, rich cultural landscape and numerous tourist attractions, the four seasons are different, attracting a large number of tourists to visit here every year, and has a high reputation and influence in the Beijing-Tianjin-Hebei region.
Zhangjiakou section of Zhangcheng Expressway (Chongli to Zhangchengjie) has a total length of 101.807 kilometers, passing through Chongli, Zhangbei, Guyuan three counties, and Chengde section of Zhangcheng Expressway. Construction began in April 2013 and is scheduled to be completed by the end of 2015.
Zhangcheng Expressway is an important east-west trunk line in the northernmost part of Hebei Province, connecting Daguang Expressway, Beijing-Tibet Expressway and Erqin Expressway. It is an important channel connecting Jiangda Sea and East West Union in northeast and northwest regions, and is listed as the great outer ring road of Beijing National highway network , for propulsion Beijing-Tianjin-Hebei integration It is of great significance to promote poverty alleviation and development in Zhangcheng area and divert transit traffic pressure from Beijing.
The roadbed width of Zhangcheng Expressway is 24.5 meters, and there are 1 large bridge, 14 Bridges, 27 middle Bridges, 16 small Bridges, 152 culverts, 2 long tunnels and 1 middle tunnel. The whole line has 2 service areas and 4 interchange seats. simultaneously Nanshan kiln , War Sea, Camp Sissing, Guyuan Four connecting lines are set up to connect the major ski resorts in Chongli County, the Wuguandian Wetland Park, the Grassland Heaven Road and the Huapiling Scenic Area.
At present, the whole Zhangcheng high-speed line is under intense construction, and all the projects are in order. Upper slope protection and drainage works, bridge works, tunnel lining, road base plan to be completed by the end of July; The protection of the lower slope, the concrete pavement of the tunnel and all the asphalt surface are scheduled to be completed by the end of September; The construction, transportation and afforestation projects will be completed before the end of October; By the end of November, the mechanical and electrical engineering was completed, and the whole line was ready for traffic; It opened to traffic at the end of December.
The Hua PI Ling Tunnel is a two-track tunnel, the left line is 2994 meters long, the right line is 2944 meters long, which is a key control project of the whole line China Railway 11th Inning Zhang Chengc to undertake construction. On 28 May, the left line of the Huapiling Tunnel was successfully completed, which was another major breakthrough after the right line was successfully completed on 20 May. Subsequent secondary lining, road and other projects are scheduled to be completed by the end of July.
After the completion of the Grassland Tianlu and Zhangcheng Expressway connection line, it will give full play to the radial force and pulling power of the expressway to the local economic and social development, further improve the Olympic road network structure and promote Beijing-tianjin-hebei region Coordinated development, promote the construction and development of grassland Tianlu tourism and Zhangbei County eco-tourism county, and add new impetus to the construction of Zhangbei County into a new type of county and city in the northern "One Road Belt" Grassland Tianlu economic belt.

Chengde section

broadcast
EDITOR

intro

After more than 3 years of hard work, the foundation stone of Chengde City section of Chengzhang Expressway was laid on December 30, 2011. The main line of the project starts from the north of Shantazi Village, Shuangluan District, Chengde City, through Xiaoying Town and Hongqi Town, Luanping County; Longhua County Longhua town, Taipingzhuang Township and Fengning Fengshan, Xiguanying, Tucheng and other townships end in Fengning County Datan Town Chengzhang boundary, a total length of 204 km, two-way four-lane standard, design speed of 100 km/h. The total investment in the approved budget was 25.8 billion yuan. The project has set up 8 service exchanges and local transportation links in Shantazi, Hongqi, Longhua, Fengshan, Xiguanying, Nanguan, Fengning and Datan.

progress

On March 25, 2013, the construction of the Chengde section of the Zhangcheng Expressway was fully started, and it is expected that the whole line will be opened to traffic in 2016.
It is understood that the starting point of Zhangjiakou section of Zhangcheng Expressway is connected with the Beijing-Tibet Expressway, and the 62 kilometers to Chongli has been completed and opened to traffic in September 2010, and the remaining Chongli to Zhangchengjie section of more than 100 kilometers is carrying out land acquisition and relocation work, which will be built in 2014. (There is a contradiction here with the previous, but the original) Zhangcheng high-speed will be with the Jingcheng high-speed, the Mizhuo high-speed to be built and the Zhangzhuo high-speed under construction, Jinghua (Xiaoying) high-speed, together to form the high-speed "big outer ring" around Beijing.
The project of Chengde Section of Zhangcheng Expressway is an important part of Chengde's "One ring and eight bullet" expressway network. After completion, it will become a major transportation channel for Chengde to Tangshan and Qinhuangdao ports in the east and Shanxi and Inner Mongolia energy bases in the west, which is of great significance for strengthening the exchange and cooperation between the city and Shanxi and Inner Mongolia and promoting regional economic development.
Zhangcheng Expressway along the distribution of many unique dam famous tourist attractions, such as Fengning Datan town of the first grassland in the north of Beijing, and adjacent to the Guyuan County of Zhangjiakou lightning lake, Wuhua Meadow. Since the road from Shijiazhuang to these places is far from easy to travel, few tourists from the provincial capital visit. After the Chengde section of Zhangcheng Expressway is opened to traffic, it will take only half a day to reach Fengning and Bashang Grassland from Shijiazhuang.
.
Recently, Grassland Tianlu and Zhangcheng (Zhangjiakou to Chengde) expressway connection line project (also known as Grassland Tianlu, Olympic Yingbin Avenue) in Zhangbei County Zhanhai Township started construction. As the fastest passage between Grassland Tianlu and Zhangcheng Expressway, the link is 1.3 km long and the whole project is expected to be completed and opened to traffic in 2015.
"Grassland Heaven Road" is one of the ten most beautiful highways in northern China. Professor Wang Juying, an expert on grassland Heaven Road, said: In the east, Grassland Tianlu connects Huangdi City, Zhuolu County, the origin of Chinese civilization for five thousand years; in the west, it connects Nihewan, Yangyuan County, Zhangjiakou, the hometown of Oriental human beings; in the north, it connects Zhangku Avenue and Yuanzhong Capital, the Silk Road in northern China. It is the link between China's farming civilization and grassland culture, and it is also the entrepreneurial road for northern people to take Xikou. Grassland heaven road to the Chinese nation, like a mirror; She symbolizes the arduous journey of the great Chinese nation. Therefore, grassland Heaven Road should be called the "mother road" of the Chinese nation, and not completely equivalent to the American-style Route 66.
"Grassland Sky Road" is located in Zhangjiakou City, the total length of 132.7 kilometers, the investment of 320 million yuan, the end of September 2012 was completed and opened to traffic, Chongli County Olympic ski resort, Saiwai scenic area and Zhangbei grassland style area of an important passage. "Grassland Heaven Road" along the winding, rivers and mountains, deep gully, meadow cattle and sheep, the landscape is extraordinary, showing a hundred li Bastou landscape picture, distribution of the ancient Great Wall site, Huapi Ridge, Tianquan cave (Zhangbei County Zhanhai Township, a Butai Valley), the air grassland flying beach, Baihua slope, rock mountain, wild fox Ridge and many other cultural, ecological and geological tourism resources. Because of its unique natural resources, rich cultural landscape and numerous tourist attractions, the four seasons are different, attracting a large number of tourists to visit here every year, and has a high reputation and influence in the Beijing-Tianjin-Hebei region.
Zhangjiakou section of Zhangcheng Expressway (Chongli to Zhangchengjie) has a total length of 101.807 kilometers, passing through Chongli, Zhangbei, Guyuan three counties, and Chengde section of Zhangcheng Expressway. Construction began in April 2013 and is scheduled to be completed by the end of 2015.
Zhangcheng Expressway is an important east-west trunk line in the northernmost part of Hebei Province, connecting Dadao Expressway, Beijing-Tibet Expressway and Erqin Expressway. It is an important channel connecting Jiangda Sea and East West Union in northeast and northwest regions, and is included in the national expressway network as the big outer ring road of Beijing. It is of great significance for promoting Beijing-Tianjin-Hebei integration, promoting poverty alleviation and development in Zhangcheng area, and diverting the transit traffic pressure of Beijing.
The roadbed width of Zhangcheng Expressway is 24.5 meters, and there are 1 large bridge, 14 Bridges, 27 middle Bridges, 16 small Bridges, 152 culverts, 2 long tunnels and 1 middle tunnel. The whole line has 2 service areas and 4 interchange seats. At the same time, four connecting lines are set up at Nanshan Kiln, Zhanhai, Xixinying and Guyuan, connecting Chongli County's major ski resorts, Wuhua Meadow Wetland Park, Grassland Heaven Road and Huapili Mountain Scenic spot.
At present, the whole Zhangcheng high-speed line is under intense construction, and all the projects are in order. Upper slope protection and drainage works, bridge works, tunnel lining, road base plan to be completed by the end of July; The protection of the lower slope, the concrete pavement of the tunnel and all the asphalt surface are scheduled to be completed by the end of September; The construction, transportation and afforestation projects will be completed before the end of October; By the end of November, the mechanical and electrical engineering was completed, and the whole line was ready for traffic; It opened to traffic at the end of December.
The Huapiling Tunnel is a two-track tunnel with a left line length of 2994 m and a right line length of 2944 m. It is a key control project for the whole line. It is built by China Railway 11th First Division, Cheung Chengc. On 28 May, the left line of the Huapiling Tunnel was successfully completed, which was another major breakthrough after the right line was successfully completed on 20 May. Subsequent secondary lining, road and other projects are scheduled to be completed by the end of July.
After the completion and opening to traffic of the connection line between Grassland Tianlu and Zhangcheng Expressway, it will give full play to the radiation and pulling power of the expressway for local economic and social development, further improve the Olympic road network structure, promote the coordinated development of Beijing, Tianjin and Hebei, and promote the construction and development of Grassland Tianlu tourism and Zhangbei County eco-tourism. Add new impetus to the construction of Zhangbei County into a new type of county and city in the northern "One Road Belt" grassland Sky Road economic belt.
Since September 22, 2022, Chengde Branch of Hebei High-speed Group has carried out road surface, bridge deck and tunnel restoration construction on the Chengde section of Zhangcheng High-speed of G95 Capital Ring Line. [7]