Olympic venue

The main stadium of the XXIX Olympic Games in 2008
The National Stadium is located Beijing Olympic Park Central District South, for the 29th in 2008 Olympic Games The main stadium. The total area of the project is 21 hectares, and the construction area is 258,000 square meters. There are about 91,000 seats for spectators, including about 11,000 temporary seats. The opening and closing ceremonies of the Olympic and Paralympic Games, athletics and football finals will be held. After the Olympic Games, it will become a large-scale professional place for Beijing citizens to widely participate in sports activities and enjoy sports entertainment, and become a landmark sports building and Olympic heritage.
Chinese name
Beijing Olympic Venues
Foreign name
Beijing Olympic stadiums
Floor space
21 hectares
Floor area
258000 m²
setting
Beijing Olympic Park Centre

stadium

broadcast
EDITOR
Bird's nest
The National stadium project is super class Sports building The design service life of the main structure is 100 years, the fire resistance grade is level 1, the seismic fortification intensity is 8 degrees, and the underground engineering waterproof grade is 1 level. The main building of the project is a space saddle oval, 333 meters long from north to south, 294 meters wide from east to west, and 69 meters high. The main steel structure forms the whole giant space saddle-shaped steel truss braided type" Bird's nest Structure, the total amount of steel used in steel structure is 42,000 tons, and the grade is Q460 . The concrete stands are divided into three layers: upper, middle and lower. The concrete structure of the stands is 1 layer underground and 7 layers above ground Reinforced concrete Frame-shear wall structure system. The steel structure and the upper part of the concrete stand are completely separated from each other and are not connected to each other, and the foundation sits on a connected base plate. The roof of the National Stadium is covered with a double layer of steel Membrane structure Namely, the transparent upper ETFE film fixed between the upper strings of the steel structure and the translucent lower PTFE acoustic ceiling fixed under the lower strings of the steel structure and the side wall of the inner ring.
The National stadium project is constructed according to the PPP(Private + Public + Partnership) model Beijing State-owned Assets Management limited liability company with China CITIC Group The project company jointly established by the consortium is mainly responsible for the investment and financing, construction, operation and management of the National Stadium. Citic Consortium contributed 42% and Beijing State-owned Assets Management Co., Ltd. provided 58% of the capital support on behalf of the government. Citic Consortium also owns the post-race 30 years franchise .
National Stadium project as a national landmark, 2008 Main stadium of the Olympic Games Its structural characteristics are very significant, and the structure of the national stadium is complex.
Flying Bird's Nest &
There are many characteristics and difficulties in design and construction:
1, the component size is large, the weight of the single is heavy
As the main load-bearing component of the roof structure, the truss column has a maximum section of 25m×20m, a height of 67m, and a single weight of 500 tons. The height of the main truss is 12m, the maximum span of the double through truss is 145.577+112.788m, and the maximum span of the non-through truss is 102.391m. The truss column and the main truss are large and the weight of the single is heavy.
2. Complex nodes
Because the components in this project are all box section rods, there are multiple rods in space confluence between the main structure and the primary and secondary structures. In addition, the secondary structure is complex and changeable, and the regularity is less, resulting in the node structure of the main structure is quite complicated, the node types are diverse, and the production and installation accuracy are required.
3. Tight construction period
This project is large, but the installation period is quite short, the project started on December 24, 2003, is expected to be completed before the end of 2007, the end of March 2008 completion. The construction period is tight, and the cross operation with civil construction, and the plane site is tight.
4. Large amount of welding
In this project, there are many welding and hoisting sections, long weld lengths on site, and thick plate welding, high-strength steel welding, cast steel welding, etc., resulting in a considerable amount of on-site welding work and high difficulty, and high altitude welding and overhead welding.
5, winter rain (snow) season construction
The hoisting time of the main structure of the project needs to span the winter and the Spring Festival, so there is winter rain (snow) season construction, and the construction is difficult.
Difficulties in the process of project construction:
1. Engineering organization is difficult
When the main structure is hoisted, the civil construction has not yet finished, and the on-site assembly is being carried out in a large area, so there is a phenomenon of multi-construction cross operation. In addition, the site is small, and the construction site layout, component transportation and large crane walking route are greatly restricted. At the same time, the structure of the project is complex, each lifting section is interrelated, must be assembled in a certain order, lifting, otherwise there will be a phenomenon of stagnation. Each construction party needs reasonable coordination and overall management, and the project organization is difficult.
2, the components turn over, lifting is difficult
In order to reduce the difficulty of assembly, the trusses in this project will use the lying method, and the main trusses will use the flat method (except the inner ring main trusses), so the work must be turned over after the assembly and before hoisting. Due to the large size and heavy weight of the member, it is difficult to set the lifting point and select the lifting lug when turning over, especially the turning over of the truss column, and the force of the lifting lug changes during the turning and lifting, so it is necessary to consider the three-way force. At the same time, stability in the process of turning over is more difficult to control. Because the section mouth of the truss column and the main truss are box section, there is a problem of multiple pipe joints in the section hoisting. For the box section, it is very difficult to ensure the accuracy of the multiple pipe joints. When lifting, it is necessary to adjust the Angle and orientation of the segmented members, and for the large and heavy members, the Angle adjustment is quite difficult, and the lifting is difficult.
3, the stability of high-altitude components is difficult
Bird's nest
Because this project adopts the bulk method (that is, the segmented hoisting method), the wind load of the high-altitude components is large during the segmented hoisting, and the stability is poor before the segments are connected as a whole or the structure is not formed as a whole, especially the stability of the upper section of the truss column and the segmented main truss is poor. Reasonable lifting sequence (as far as possible end to end, separate lifting) and lateral stability measures (such as anchor, wind rope, etc.) must be adopted.
4, welding is difficult
In this project, there are both thin plate welding, and thick plate welding, both flat welding, vertical welding, and upward welding, both Welding of high strength steel There is also the welding of cast steel parts, and the welding workload is large. Thin plate welding deformation is large, thick plate welding deposition amount is large, temperature control and labor intensity requirements are high. The high altitude welding, winter and rainy season welding of weather-proof and low-temperature measures make the welding more difficult.
5, installation accuracy control is difficult
Due to the deformation of the structure itself due to its own weight and temperature changes during the construction process, and the support tire frame will also be deformed under the action of load, in addition, the structure is complex, are box-type section members, installation accuracy is affected by the site environment, temperature changes and other aspects, installation accuracy is extremely difficult to control, and construction is difficult. During construction, necessary measures must be taken to consider in advance how to adjust and eliminate the installation error, how to measure and monitor, so that the deformation is completed in a controlled state to ensure the overall shape and construction quality.
6, high quality requirements, construction is difficult
This project is not only about the appearance quality, such as the overall size, the appearance of the weld, but also the internal quality, such as the quality grade of the weld. Welding residual stress Elimination, etc., are quite high requirements, and the site construction conditions are poor. At the same time, for the large-span space structure, the temperature deformation and temperature stress are large, so the design determines the block closing and closing temperature, which is difficult to operate.

Bird's nest

broadcast
EDITOR
Bird's Nest Stadium
Geographical location: Chaoyang District, Beijing Inside the Olympic Park on Beichen Road, The central axis of Beijing The east side of the north end ( Asian Games Village North, No. 3 Anding Road, Chaoyang District)
Functions: As the main stadium of Beijing Olympic Games, held the opening ceremony, athletics and football
Bus reference routes: Express 113, 386, 407, 665, 737, 740, 753, 804, 827, 939, 944,983 Wait until Beichen Bridge West or 839,510 to National Stadium (Bus stop Beichen-Qiaoxi)
Yingdong Natatorium [1]
Subway reference: The nearest subway station to the venue is Olympic Park Station, and three bus routes are recommended
Direct plan to take the Olympic special line can be direct.
Transfer plan One take Line 10, in Panda Ring Island You can get there by transferring to the Olympic special line.
Transfer Plan Take 2 seat Line 5, change to Line 10 at North Toseong East Road Station, and change to Olympic Special Line at Panda Ring Island Station.
Driving reference route
1. (From the stadium - Xizhimen Bridge) : North Fourth Ring Road - Beichen Road - Jianxiang Bridge - Madian Bridge - Deshengmen Bridge - Xizhimen Bridge
2. (From the stadium - Xizhimen Bridge) : North Fourth Ring Road - Beichen Road - Panda Ring Island - Anhua Bridge - Bell Tower North Bridge - Deshengmen Bridge - Xizhimen Bridge
3. (From this arena - Dongzhimen Bridge) : North Fourth Ring Road - Beichen Bridge - Anwar Bridge - Bell Tower North Bridge - Andingmen Bridge - Yonghe Lama Temple Bridge - Dongzhimen Bridge
4. (From the stadium - Dongzhimen Bridge) : North Fourth Ring Road - Beichen Bridge - Anhui Bridge - Andingmen Bridge - Yonghegong Bridge - Dongzhimen Bridge

The Water Cube

broadcast
EDITOR
Water Cube Stadium
The Water Cube
The membrane structure of "Water Cube" is its biggest feature. The 1437 bubbles that have been installed are strong enough to withstand the weight of a car. In addition, these membranes are very malleable and can be stretched to three to four times their own size. The ignition point of more than 715 degrees will ensure the fire safety of the membrane structure, even if it is ignited, this material will not spread when burning, and no smoke, no combustion falls. "Spectators can safely watch the game in the field below the 'bubble'
Location: Olympic Park, Beichen Road, Chaoyang District, Beijing National aquatics center interior
Competition function: Swimming Water polo dive Synchronized swimming
Schedule: Closing ceremony and football match
Related introduction: The National Aquatics Center has 6,000 fixed seats and 11,000 temporary seats, and the intestinal tube has become a fitness center with international advanced reviews.
Bus reference routes: Express 983,113,656,737,740,753,804,827,939,944,386,407 Wait until Beichen Bridge West or 510,839 to National Stadium (Bus stop Beichen-Qiaoxi)
The Water Cube
Subway reference route: The closest subway station to the venue is Olympic Park Station, and three bus routes are recommended
Direct plan to take the Olympic special line can be direct.
Transfer plan 1 Take Line 10, transfer to Olympic special Line at Panda Ring Island station.
Transfer Plan 2 Take Line 5, transfer to Line 10 at Chengdong Road Station in Beishi City, and transfer to Olympic Special Line at Panda Ring Island Station.
Driving reference route
1. (From the center - Xizhimen Bridge) : North Fourth Ring Road - Jianxiang Bridge - Madian Bridge - Deshengmen Bridge - Jishui pool Bridge - Xizhimen Bridge
2. (From the center - Dongzhimen Bridge) : North Fourth Ring Road - Anhui Bridge - Anzhen Bridge - Andingmen Bridge - Yonghegong Bridge - Xiaojie Bridge - Dongzhimen Bridge
Planning road: West Road along the lake to the north, via Datun Road On Lap road (It was put into use before the 2008 Olympic Games).

Shooting hall

broadcast
EDITOR
Beijing Shooting Range Hall
Beijing Shooting Range Hall is located in the west Fifth Ring Road of Beijing, south of Xiangshan Road, north of Cuiwei Mountains, the total land area of about 6.45 hectares, construction area of more than 47,000 square meters (including temporary stands). The venue includes qualification hall, final hall, permanent ammunition warehouse and outdoor supporting facilities, yes Beijing Olympic Games One of the new major competition venues.
Bus route: Take subway Line 1 to Apple orchard Get off and change to 664 at Beijing Shooting Range Get off; Take Line 2 at Fuchengmen Get off and change to No.489 and get off at Beijing Shooting Range.
Driving route: Drive to the Fifth Ring Road, drive to Xiangshan South Road, then walk 300 meters to the destination.

Wukesong Museum

broadcast
EDITOR
Wukesong Gymnasium
Wukesong Stadium is a key construction project of Wukesong Culture and Sports Center, with a construction scale of 63,000 square meters and a capacity of about 18,000 spectators.
The construction of Wukesong Stadium is an important milestone in Beijing's preparations for the Olympic Games, indicating that the construction of Beijing's Olympic venues is actively and steadily moving forward.
It will be taken after the game Basketball game Mainly, all kinds of large basketball games at home and abroad will be considered to be held here.
Main function: Basketball

Bicycle gym

broadcast
EDITOR
The Old Mountain Bicycle Gym
Location: West of the Cycling and Fencing Management Center base of Laoshan State General Administration of Sports, Shijingshan District, Beijing
Venue Type: New competition venue
Uses during the Olympic Games: Track cycling
Construction area (㎡) : 32920
Fixed seating capacity: 3000
Temporary seating capacity: 3000

Water park

broadcast
EDITOR
Olympic Water Park
Construction location: Beijing Shunyi District North Xiaoying Town Chaobai River Penn
The Olympic Water Park
Uses during the Olympic Games: rowing , Kayaking (still water), slalom, Marathon swimming Triathlon
Building area: 31,850 square meters
Fixed seating capacity: 1200
Temporary seating capacity: 25,800 (10,000 standing seats)

Nongdaquan

broadcast
EDITOR
China Agricultural University Gymnasium
【 Location 】 : China Agricultural University East Campus
[Use during the Olympic Games] : Wrestling
【 Construction area 】 : 23,950 square meters
[Fixed seat number] : 6000
[Temporary seats] : 2500

Peking University Hall

broadcast
EDITOR
Location: Peking University
Use during the Olympics: Table tennis
[Construction area] (㎡) : 26,900
[Fixed seat number] : 6000
[Number of temporary seats] : 2000

Beijing University of Science and Technology

broadcast
EDITOR
Peking University Gymnasium
Use during the Olympics: Judo, Taekwondo
Building area: 24,662 ㎡
Fixed seating capacity: 4000
Temporary seats: 4000

The Great Hall of Beijing Engineering

broadcast
EDITOR
University of Science and Technology Beijing Gymnasium
[Use during the Olympic Games] : badminton, rhythmic gymnastics
【 Construction area (㎡) 】 : 24383
[Fixed seats] : 5800 seats
[Number of temporary seats] : 1700

Capital pavilion

broadcast
EDITOR
【 Location 】 : Haidian District White Stone Bridge East side
Gymnasium Competition hall, can play table tennis, badminton, volleyball, basketball, gymnastics, Ice hockey Figure skating and many other sports activities

Softball court

broadcast
EDITOR
Venue name: Fengtai Softball Field
Use during the Olympics: Softball
Building area: 15,570 square meters
Fixed seating capacity: 5000 (home), 3500 (standby)
Temporary seats: 5000

Yingdong Hall

broadcast
EDITOR
Yingdong Natatorium
Uses during the Olympics: Water polo, Modern pentathlon (Swimming)
Building area: 44,635 square meters
Number of fixed seats: 6000
Number of temporary seats: None

Old Mountain bike Yard

broadcast
EDITOR
Old Mountain bike Park
Construction site: Laoshan, Shijingshan District
Game time function: Mountain bike
The Old Mountain Bicycle Gym is 2008 Beijing Olympic Games One of the main competition venues, by State General Administration of Sport To undertake construction management. The State General Administration of Sport decided to entrust Beijing International Bidding Co., Ltd. to organize the "2008 Olympic Games Laoshan Cycling Hall architectural design competition" activities.

Shooting Range

broadcast
EDITOR
Beijing Shooting range UFO range
Location: South Xiangshan Road, Shijingshan District
Use during the Paralympic Games: None
Building area: 6170 square meters
Number of fixed seats: 1000
Temporary seats: 4000

Sailing center

broadcast
EDITOR
Qingdao Olympic Sailing Center is located in the eastern New district of Qingdao Fushan Bay, the original site of Beihai shipyard
Qingdao International Sailing Center covers an area of about 45 hectares, including 30 hectares of stadium area and 15 hectares of post-competition development zone. All the necessary facilities for the Olympic sailing competition are located in the venue area, including the Olympic village, the athletes' center, the administration center, the venue media center and the logistics supply and support center, with a total construction area of about 138,000 square meters, in addition to the measuring hall, the land stopping area, the launching ramp, the main and secondary breakwaters, the Olympic memorial wall and other supporting facilities. Qingdao International Sailing Center will be built in 2006. After the base is put into use, it can undertake world-class sailing competitions of corresponding levels and scales. After the 2008 Olympic and Paralympic Games, the competition facilities in the Qingdao International Sailing Center will be slightly adjusted to meet the needs of building a "sailing city" and post-competition development and tourism.

Shanghai Fair

broadcast
EDITOR
Shanghai Stadium [Football Qualifier]
Venue name: Shanghai Stadium
Also known as: Shanghai 80,000 Stadium Also known as eighty thousand people
Seats (per seat) : 56,000
Function: 2008 Beijing Olympic football preliminary match, as the Shanghai sub-stadium competition venue

Qinhuangdao Farm

broadcast
EDITOR
Qinhuangdao Olympic Stadium [Football Qualifier]
Qinhuangdao is located on Hebei Street, Haigang District, Qinhuangdao City Olympic Sports center It covers an area of 556.78 mu, including stadiums, gymnasiums, sports schools, sports hotels, supermarkets and other multi-functional supporting facilities, with an estimated total investment of 1.085 billion yuan. As the Beijing Olympic Games Football point The stadium project broke ground in May 2002, the main building is six floors, with an athletics field and a 400-meter standard track that can meet the international competition Soccer field With a capacity of 33,000 spectators. It is expected to be operational by May 2004, thus becoming Beijing Olympic Venues The first project started and completed in China.
Building size: 33,000 stands, 48,000 square meters
Location: Qinhuangdao Sports Center, Hebei Street, Qinhuangdao City

Racetracks in Hong Kong

broadcast
EDITOR
Hong Kong Olympic Racecourse [Equestrian events]
Location: Sha Tin, New Territories, Hong Kong
Event function: equestrian competition
Site introduction: Venue steeplechase and dressage The main venue is a 100 m x80 m all-weather sand main venue with a capacity of 18,000 spectators. The venue is composed of Hong Kong Sports Institute and Sha tin racecourse Built out of it. Horses are available on the premises Warm-up area Other venues include: an air-conditioned building next to the main venue, which will be used as the race management headquarters, VIP reception area and accommodation for horse service staff; The new main stables, divided into four, provide 200 air-conditioned horses; There are also separate stables for reserve horses.

Tianjin Yard

broadcast
EDITOR
Tianjin Olympic Stadium [Football Qualifier]
Construction location: Tianjin
Game features: Football qualifiers
Tianjin Olympic Stadium [2]
Tianjin Olympic Center Stadium Located in the Olympic Center in Nankai District, southwest of Tianjin, it covers an area of 34.5 hectares, with a construction area of 158,000 square meters and a total investment of 1.48 billion yuan.

Shenyang Farm

broadcast
EDITOR
Shenyang is one of the cities in the football division of the 2008 Olympic Games. The Wulihe Stadium project is a key sports facility project for hosting the football match of the Olympic Games. The construction lasted 16 months. Wulihe Stadium is located in Shenyang City Hunnan new District The core area covers a total area of 25.33 hectares, with a total construction area of more than 100,000 square meters, with two tiers of stands and 102 boxes, which can accommodate 60,000 spectators.