Taizicheng Station

Railway station in Chongli District, Zhangjiakou City, Hebei Province, China
Collect
Check out my collection
0 Useful +1
0
Taizicheng Railway Station is located in Taizicheng China Hebei Province Zhangjiakou City Chongli District Within the territory, yes China Railway Beijing Group Co., LTD The railway station under its jurisdiction is the intersection station of Chongli Railway and Taixi Railway, and it is also the key supporting transportation facilities for the 2022 Beijing Winter Olympics.
In September 2018, construction of Taizicheng Station began [1] ; On July 25, 2019, the main structure of Taizicheng Station was completed [2] ; On December 30, Taizicheng Station was put into operation with the opening of Chongli Railway [3] .
As of January 2020, Taizicheng Station has a total construction area of 11,988 square meters, with three stations and four lines [4] .
Chinese name
Taizicheng Station
Foreign name
Taizicheng Railway Station
Commissioning date
December 30, 2019
Subordinate region
Chongli District, Zhangjiakou, Hebei Province, China
Floor area
11,988 square meters (as of January 2020)
Platform scale
3 units 4 lines (as of January 2020)
Station address
Taizicheng village, Chongli District, Zhangjiakou City, Hebei province

Historical evolution

broadcast
EDITOR
In December 2015, the Environmental Impact Assessment of the Chongli Branch Line of the New Beijing-Zhang Railway was released, and the Chongli Railway began at Xihuayuan North Station and ended at Taizicheng Station [5] .
In September 2018, construction of Taizicheng Station began [1] .
On May 10, 2019, the construction of Taizicheng Station traffic Center began [6] ; On May 17, the turnout project of Taizicheng Station entered a critical period [7] ; On July 25, the main structure of Taizicheng Station was completed [2] ; On December 30, Taizicheng Station was officially put into use [3] ; At the same time, Taizicheng station started to use electronic ticket business, passengers can hold a card "swipe face" [8] .
On March 24, 2021, the supporting passenger transport facilities of Taizicheng Station were put into use [17] .
On June 13, 2022, the Ministry of Ecology and Environment issued the "Reply to the Environmental Impact Report of Taizicheng to Xilin Hot Railway", which starts from Taizicheng Station of Chongli Railway in the south of Taixi Railway. [18]
Taizicheng Station under construction

Building scale

broadcast
EDITOR

Architectural design

  • Design concept
The design of Taizicheng station is based on the concept of connecting mountains and rivers, meeting the Winter Olympics, ice and snow town, and passion for ice and snow. The main station room is mainly white in color, and the bird's eye view is like a piece of jade inlaid in the mountain, and like a crystal clear pearl, corresponding to the theme of the 2022 Winter Olympics passion ice and snow [4] ; The central entrance hall uses the original wood color to form the architectural style with natural beauty [9] .
Taizicheng Station adopts above-ground steel structure and underground reinforced concrete structure. The station design respects nature and preserves natural landscape resources as much as possible. The station building is backed by mountains and faces water, connecting between mountains and rivers. The shape design draws on the natural mountain curve, landing in a lune-shaped hyperbolic arc, and gradually converges to the two sides of the end symmetrical, echoing the mountain and naturally integrating with the surrounding environment [10] ; Fully respect the nature, reflect the characteristics of mountain architecture, green architecture, architectural design with Chongli regional style [4] .
  • Design parameter
As of December 2019, the total construction area of Taizicheng Station is 11988 square meters; The main station building is 210 meters long, the middle part is 27 meters wide, and the building height is 16.8 meters [11] .
As of January 2020, the main station building area of Taizicheng Station is 5,990 square meters, and the underground transfer center area is 5,998 square meters. Platform area of 14,000 square meters, platform canopy construction area of about 21007 square meters [4] .
Inside the waiting room of Taizicheng Station

Overall layout

Taizicheng Station is opposite the Winter Olympic Games award square, is a small passenger station, is divided into three levels, by the underground one, the ground one and the local mezzanine. The ground floor of Taizicheng Station is the inbound floor, which is equipped with a comprehensive service center, entrance, waiting room, etc. It adopts the central inbound type, and the left side is the power distribution room and office room. On the right are the ticket hall, VIP waiting room and equipment room; The ground floor is the transfer center, which is equipped with the express access channel, the Olympic temporary access channel, the comprehensive service center during the Games and the railway culture exhibition hall to serve the ordinary passengers during the Olympic Games [11-12] .
Taizicheng station overlooking

Platform line

broadcast
EDITOR
As of January 2020, Taizicheng Station has 3 stations and 4 lines; Among them, platform 1 is reserved for the Winter Olympics, for the use of athletes during the 2022 Winter Olympics. The railway line that passes through Taizicheng Station is Chongli Railway [4] .
Taizicheng Station platform

Operation situation

broadcast
EDITOR

Ticket service

As of December 2019, Taizicheng Station does not have a traditional ticket office, but a comprehensive ticket service center with 3 counters for manual ticket sales and 7 automatic ticket machines. There are 6 self-service entrance gates, 1 semi-self-service entrance gate, 4 self-service exit gates and 1 semi-self-service exit gate in Taizicheng Station.
Intelligent EMU stops at Taizicheng Station platform

Equipment and facilities

  • Solar heating system
Interior of Taizicheng Station
As of January 2021, Taizicheng Station is equipped with a solar heating system, and solar panels are laid on the top of the station buildings, which can absorb solar energy into heat energy through the heating system, and blow warm air through the exhaust vents in the station to ensure that the temperature in the waiting room is suitable.
  • Floor heating installation
Taizicheng Station remote assistance ticket machine
As of January 2021, the waiting room of Taizicheng Station has been equipped with floor heating devices, covering an area of more than 1,100 square meters.
  • Smart water dispenser
As of January 2021, the waiting room of Taizicheng Station has a smart drinking machine, which can provide passengers with drinking water at different temperatures through the automatic water temperature adjustment function.
  • Remote assistance with ticket machines
As of January 2021, Taizicheng Station ticket integrated Service Center has a remote assistance ticket machine, which supports passengers to remotely connect staff through voice and video calls to obtain help for passengers to purchase tickets without operation.

Passenger flow

From December 30, 2019 to January 13, 2020, a total of 19,000 passengers and 21,200 passengers arrived at Taizicheng Station [4] .
In January 2020, the average daily passenger flow of Taizicheng Station is about 1,700 people, and the weekend peak reaches more than 3,000 people [4] .

Traffic transfer

broadcast
EDITOR

Bus route

As of January 2020, Taizicheng Station can transfer to one urban bus line [14] .
Bus route
Operating interval
One-way fare
First and last shift
Departure frequency
Chongli bus No.10
Bus station - Taizicheng high-speed railway station
3 yuan/person
Taizicheng high-speed Rail station - bus station: 07:00-21:00
30 minutes

Scenic bus

As of January 2020, Taizicheng Station can transfer to six free ski resort buses to each ski resort [14] .

taxi

As of January 2020, there are taxi pick-up points outside Taizicheng Station, where passengers can transfer to taxis [14] .

Cultural characteristics

broadcast
EDITOR

Characteristic service

  • The game service center
There is a race service center at the transfer center on the ground floor of Taizicheng Station to provide services for passengers in need [13] .

Station culture

  • Cultural theme
The cultural theme of Taizicheng Station is "no boundaries", which means that geography has no boundaries in high-speed railway, landscape has no boundaries in human heart, and the Olympics has no boundaries in human beings. This also reflects that the Beijing-Zhang high-speed Railway has created a number of major projects with unique originality, cultural, artistic and practical organic combination, and has set a model and benchmark for China's railway construction in the new era [4] .
Winter Olympics relief
  • Cultural element
In the decoration process of Taizicheng Station, a large number of Chinese cultural elements such as screen printed glass railings, Mosaic cultural walls, clear water column seal sculptures, and ground parqueting were incorporated. The circular columns in the waiting hall are decorated with hand-carved decorations, which depict the mountains of Chongli region through different shades and colors [10] .
Cultural elements in Taizicheng Station
  • History exhibition hall
On the ground floor of Taizicheng Station, there is a historical exhibition hall of the hundred-year Beijing-Zhang Railway, showing the development history of the hundred-year Beijing-Zhang Railway. In the exhibition hall, there are new and old railway tracks, intelligent EMU train models, Beijing-Zhang railway tunnel models, etc., reflecting the historical development and scientific and technological progress [4] .
Taizicheng Station underground culture exhibition hall
  • Train model
As of January 2021, there is a Fuxing CR400BF-C intelligent EMU model on display in the waiting room of Taizicheng Station, which is used to operate between Beijing North Railway Station and Taizicheng Station and is a customized service model for the 2022 Beijing Winter Olympic Games.
Models on display at Taizicheng Station

Construction planning

broadcast
EDITOR
  • Railway line
Taixi Railway starts from Taizicheng Station of Chongli Railway in the south, passes through Chongli District of Zhangjiakou City, Zhangbei County, Guyuan County, Saibei Administrative District, enters Zhenglan Banner and Abaga Banner in Xilin Gol League, ends in Xilin Hot City in the north, connects with Chongli Railway under construction in the south and connects with Xi Second line in the north, with a total length of 384.083 kilometers [15] .
On November 13, 2019, Tai-Tin Railway launched a survey [15] .

Value meaning

broadcast
EDITOR
Taizicheng station is the terminus of the Chongli branch of the Beijing-Baoshan high-speed Railway, which takes only one hour to travel to Beijing during the Winter Olympics. After the Winter Olympic Games, Taizicheng Station is also an important station for tourism and sports in Chongli District, which plays a positive role in promoting the economic development of Chongli District [16] . (Review of Zhangjiakou Evening News)