Beijing - Chongli Expressway

Highways in China
synonymJingli Expressway(Expressway in Beijing and Hebei Province) generally refers to the Beijing-Chongli Expressway
Beijing - Chongli Expressway [6] , for short Jingli Expressway The Beijing-Tianjin-Hebei Expressway is numbered S3801, with a starting point at Changping District, Beijing Sixth ring road , end to Hebei Province Zhangjiakou City Chongli District Capital Loop highway white flag mutual, the overall northwest - southeast direction.
Jingli Expressway Xingyan Expressway with Yanchong Expressway Merge into [1] , yes 2019 Beijing International Horticultural Exposition and 2022 Beijing Winter Olympic Games Essential supporting infrastructure for mitigation Beijing-tibet Expressway Chronic congestion has opened up new avenues.
Construction of the Xingyan section of the Beijing-Li Expressway began in 2016 [2] The Yanchong section started in 2017, and the Xingyan Section and Yanchong Beijing Plain Section were opened on January 1, 2019. Beijing Sixth Ring Road -G110 Xinjiapu, K1-K57), opening section from Huailai North to Taizicheng on December 30, 2019 (K86-K153) [3] On January 23, 2020, the G110 Xinjiapu to Huailai North section (K57-K86) will be opened, and on August 31, 2021, the Yanchong extension section (Taizicheng - Zhangcheng Expressway Baiqi, K153-K169) will be opened. [7] On September 26, 2021, the Akagi Branch Line was officially opened to traffic. [8]
Chinese name
Beijing - Chongli Expressway [6]
Foreign name
Beijing-Chongli Expressway
Geographical position
Beijing , Zhangjiakou City
length
169 km
Initial point
Beijing Changping District Sixth ring road Tucheng West Bridge interconnecting
Terminal point
Zhangjiakou City Chongli District Capital Loop high-speed Baiqi interchange
numbering
Beijing-tianjin-hebei Expressway S3801 [6]

Route planning

broadcast
EDITOR
by China Railway Construction Corporation The Xingyan section of the Beijing-Li Expressway, which is jointly funded by the Beijing Municipal Government, is 42.2 kilometers long and is designed as a two-way four-lane road, with the long-term two-way six-lane traffic conditions reserved. The Xingyan section of the Beijing-Li Expressway will be merged with the Yanchong section to form the Jingli Expressway, forming the third high-speed corridor in the northwest direction of Beijing. As an important part of the Beijing-Tianjin-Hebei integrated road network pattern, the 2019 Expo, 2022 Winter Olympics Provide transportation support.
The Beijing-Li Expressway (Beijing section) has all the road facilities in place, which will provide safe and fast traffic services for the Beijing Winter Olympics. The Winter Olympics supporting service area of this highway fully reflects the green and low-carbon concept, and all use ground source heat pump and solar energy for building heating, cooling and domestic hot water. [9]

Xingyan Expressway

broadcast
EDITOR
Located to the west of Beijing-Tibet Expressway, Beijing Xingyan Expressway runs north-south. It is the main traffic artery of Beijing 2019 Expo, with a total length of 42.159km.
Xingyan Expressway starts from the West sixth ring Tucheng interchange in the south, and connects with Shangzhuang Road in the long run. The line crosses the Jingmi Diversion Canal in the northwest direction and intersects with Wennan Road after Sijiazhuang, Tingzizhuang and Ge villages. The line continues to follow the south side of Changliu Road to the west, turns to the south side of Beiliu Village to the northwest, enters the mountainous area from Baiyangcheng Village, routes along the east side of Baiyangchenggou mountain, and passes Shixia Village and Bangshuiyu Village to the east. After passing the ski resort, it heads north to cross the Beijing-Tibet Expressway and the Beijing-Bao Railway, and then connects with the Yangao Expressway on the east side of Badaling Airport. [2]

Yanchong Expressway

broadcast
EDITOR
Move towards
Extend the high highway (Yanqing-Chongli) with a total length of about 116 kilometers, it is a direct high-speed channel between the Yanqing 2022 Winter Olympic Games stadium and Chongli Zhangjiakou stadium. The Beijing section of the project is about 33 kilometers long, starting from the west side of Dafutuo Village in Yanqing District, connecting with Xingyan Expressway, and ending with Hebei section of Yangao Expressway at the city boundary. [3]
The Hebei section of the railway is 113.684 km long, of which the main line is 81.552 km long, the extension line is 17.073 km long, and the Chicheng branch line is 15.059 km long, passing through Huailai, Chicheng and Chongli counties (districts) in Hebei Province. The Hebei section of Yangao Expressway is located in the mountainous area with a large proportion of Bridges and tunnels and the first spiral tunnel in the province. [4]
Driverless test
The relevant person in charge revealed that there are many smart innovation places in Yanlofty Speed. For example, the whole process is equipped with environmental monitoring, which can provide temperature, wind, wind direction and pollutant values.
In addition, in terms of unmanned driving, Yangao speed is doing program design. The specific range is from the service area exit to the Beijing competition section, and it is expected to conduct driverless testing before the test. "This section has fewer entrances and exits, a total length of 18 kilometers, and the connection time during the race is about 20 minutes, and spectators are expected to try the driverless road test."
Guishui River tunnel
In the Guishui River section, Yansheng Express abandons the traditional bridge building mode and chooses the way of building a tunnel through the Guishui River.
The reporter saw at the construction site of the Guishui River tunnel that the south bank of the Guishui River has completed the river diversion and the tunnel is under construction. The working surface is more than 2,000 meters long and 90.5 meters wide. The executive deputy manager of the second contract section of Yangao Expressway (Beijing Section) project introduced that the river will be divided into two diversion construction, and the tunnel will form a landscape under the river after completion. "In addition to the tunnel can be seen at the tunnel entrance and exit, the middle part of the tunnel is all hidden under the river and garden, integrated with the natural landscape, from the height is still a pool of water, similar to the West Lake tunnel."

Road information

broadcast
EDITOR
Entrances and service facilities
Mileage number
name
Connecting road
type
remark
1
Double cross interchange
G45 01 North 6th Ring Road
interflow
-
5
Katamura
S218 Winnan Road
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
-
Go to the service area
-
Service area
-
13
Xifeng Mountain
S219 Nanyan Road
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
-
Ladder Valley parking area
-
Parking area
Not yet open
41
Ying Cheng Zinan
S216(G6 Side Road)
exit
Beijing exit
41
Yingchengzi Interchange
G6 Beijing-Tibet Expressway
interflow
No south to east ramp
41
Yanqing Science Park
X032 Outer Stone Road
Entrance
Entrance to Beijing [5]
-
Management center
-
passageway
Exclusive road
Social vehicles are banned
43
Large tote
It's S232妫川
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
46A
Donghong Temple
G234 Xingyang Line
passageway
Entrance to Beijing
Beijing exit
46B
Xiaofeng Ying
Minor road
exit
Beijing exit
54
Fuyutun
River CAM Road
passageway
Not yet open
-
Hanzumi Service Area
-
Service area
Open in Beijing only
The outbound direction is not open
57
Beijing-new Expressway interchange
G7 Beijing Expressway
interflow
Not yet open
Westbound South/southbound west ramp only
57
Sinjiabu
G110 Beijing-Qing Line
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
69
West Dazhuang Family
X012
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
-
Sea Tuo service area
-
Service area
Not yet open
86
Huailai North
G239
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
105
hider
G239
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
-
Sea Tuo service area
-
Service area
-
117
Minami Akagi
S353
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
124
Akagi
G239
passageway
-
-
Akagi Service Area
-
Service area
153
Taizi City
Y101
passageway
Beijing exit
Exit entrance
Entrance to Beijing
Beijing exit
170
White flag communication
G95 Capital Loop high-speed
interflow
All eastbound ramps are open
Traffic restriction notice
From 0:00 on January 4, 2022 to 24:00 on March 16, 2022, the Beijing-Li Expressway entering and leaving the Beijing Bidirectional Hanquan Service Area and the on-ramp entering and leaving the service area are prohibited to other vehicles and pedestrians except vehicles and personnel with special certificates issued by the Beijing Winter Olympic Organizing Committee. [10]