Beijing-yuanping Railway (hereinafter referred to as Jingyuan Railway) is a national railway connecting Beijing and Yuanping City in Shanxi Province, a class I passenger and cargo shared single-track railway, the line is east-west, was in the 1960s to 1970s. Third-line construction Period by Chinese People's Liberation Army railway Corps The important war readiness railway built by the army is also an important part of the middle road of Shanxi coal transport. [1-2]
The Jingyuan Railway is constructed by constructing new lines and merging old lines, and is operated in stages. The western section (the section from Yuanping to Zolin) was built in advance in October 1958, rebuilt from the Yuanping Railway built during the Anti-Japanese War, and was completed in October 1960 and delivered for temporary operation. The middle section (Zaolin to Lianggezhuang section) started construction in November 1965, the track was laid on October 30, 1971, the preliminary acceptance was passed in July 1972, and the passenger transport was opened on December 31, 1972. The eastern section (Lianggezhuang to Shijingshan South section) began construction in November 1965 and was initially opened to traffic on October 1, 1969. [1]
As of 2003, the railway is 418.64 km long, with a design speed of 100 km/h and a maximum operating speed of 80 km/h. [1]
Chinese name
Keihara Railway
Foreign name
Beijing-Yuanping Railway
Opening date
December 31, 1972
Line length
418.64 km
Design speed
100 km/h
Operating speed
80 km/h
Railway class
National Railway Class I
Number of stations
fifty-three
Passing province
Beijing, Hebei and Jin
Passing city
Beijing, Baoding, Datong, Xinzhou

Historical evolution

broadcast
EDITOR
  • Construction background
In the 1960s, Sino-Soviet relations deteriorated due to Khrushchev's reforms. At the same time, as the Vietnam War intensified and the United States sent more troops to the Taiwan Strait, Sino-American relations were also increasingly tense; Influenced by the Soviet Union and the United States, India, Japan, South Korea and other countries are also hostile to China. At that time, China's military industry was evenly distributed in the eastern and coastal areas, and once the war position would be extremely unfavorable, so the "three-line construction" plan was put on the strategic level of China. In order to facilitate the evacuation of leaders during the war, coal and other minerals were transported in peacetime, and the construction of a line from Beijing to the deep mountains of the Taihang Mountains and eventually to the Yuanping Railway was included in the "third-line construction" plan.
  • Planning and construction
In March 1958, the Jingyuan Railway was investigated and designed by the Third Design Institute of the Ministry of Railways and a design statement was prepared. From April to June, the section from Beijing to Zaolin was surveyed. In June, the design proposal passed the identification of the Ministry of Railways, and the east end of the line was connected at Shijingshan South Station, and the west end was connected at the original level. In October, in order to meet the needs of the construction of Wutaishan Iron Mine, the western section (the section from Yuanping to Zolin) was built in advance, which was rebuilt from the Yuanping Railway built during the Anti-Japanese War.
In October 1960, the track laying from Yuanping to Zaolin was completed and delivered for temporary operation.
In October 1961, the Ministry of Railways of the People's Republic of China approved the appraisal opinion on the Preliminary Design of Beijing-Yuan Railway.
In April 1963, the Ministry of Railways of the People's Republic of China submitted to the State Planning Commission of the People's Republic of China the "Beijing-Yuan Railway Plan Assignment Book".
In 1964, the State Planning Commission of China approved the "Jingyuan Railway Plan Task Book", and compared with the preliminary design appraisal opinion, the technical standard of the line has changed.
In May 1965, the construction preparation of the Beijing-Zaolin section of the Jingyuan Railway was carried out. In November, the key project of the eastern section (Beijing to Zaolin section) began.
In 1967, the construction of the Beijing-Zaolin section of the Beijing-Yuan Railway was fully started. Yimaling Tunnel and Pingxingguan Tunnel to the west of Zijingguan have been started. In April, when the 14th Division of the Railway Corps was digging into the Yimaling Tunnel, it failed to detect the existence of an underground river 20 meters from the west entrance, and a 50-man engineer squad fell into the cave, killing all of them. After the accident, the designers moved the tunnel to the north and crossed it in the form of an integral ballast bed.
On June 1, 1969, the track was laid from Shijingshan South Station. In September 1969, the main construction of Yimaling Tunnel was completed. On October 1, the section between Beijing and Lianggezhuang was opened to traffic.
In early 1970, the central government requested that the entire Keihara Railway be opened to traffic by the end of 1971. In April, the line continued westward from Liang Gezhuang. In September, the track was laid east from Zaolin.
On October 30, 1971, the line was connected at 242 km from Lingqiu.
In July 1972, all lines of the Keihara Railway passed preliminary acceptance. In November, the Ministry of Communications of the People's Republic of China and the Chinese People's Liberation Army carried out acceptance and handover of the Beijing-Yuan railway. On December 31, the Jingyuan Railway was officially delivered to the Beijing Railway Branch and Datong Railway Branch of the Beijing Railway Bureau at the Beijing end of Lingqiu Station, and passenger trains were opened. As the railway was prepared for war, no opening ceremony was held on the Keihara Railway. [1]

Line station

broadcast
EDITOR

Technical standard

Design parameter
Line length
418.64 km
Railway class
National Railway Class I
Linear scale
Single line
Transport capacity
Initial 3 million tons, recent 5 million tons, long-term 10 million tons
Restricted grade
6‰, Pingyu to Pingxingguan west 20 kilometers down double machine 12‰
Minimum curve radius
600 m
Effective length of arrival and departure line
650 m (reserved 850 m)
Block system
Relay semi-automatic
Dynamic mode
Internal combustion traction (Shijingshan South to Lingqiu)
50 Hz /25 kV CATenary power supply (flat to Spirit Hill)
Reference materials: [1] [3]

Station along line

As of 2003, there are 50 stations along the Keihara Railway. [4]
Serial number
Station name
Mileage (km)
Class of station
Location address
Regional management
1
0
one
Beijing
Fengtai District
Lugou Bridge Street
2
10
four
Yungang street
3
19
Fangshan District
Qinglonghu Town
4
28
5
31
Yanshan Office
6
35
two
Zhoukoudian town Lianggezhuang village
7
48
four
Han Cun River town
8
54
Dashiwo Town
9
62
Zhangfang Town
10
73
Shidu town
11
78
12
87
Hebei Province
Laishui County
Sanpo town Shangzhuang village
13
96
Sanpo town Gogezhuang village
14
102
Zhao Gezhuang town Fushankou village
15
109
three
Zhaogezhuang town Baijian village
16
114
four
Zhao Gezhuang town plate city village
17
122
Yixian County
South city division township North Xinzhuang village
18
130
South town Qifeng tower village
18
138
Zijingguan town Zijingguan village
20
146
Zijingguan town big pan stone village
21
154
Laanyuan County
Ta Ya Yi Township Ta Ya Yi village
22
160
Wang An Town Wang An town village
23
171
Yangjiazhuang town Futu Yu village
24
178
Laiyuan town Beitun village
25
185
three
Laiyuan town Shili Bay village
26
194
four
Laiyuan town small west village
27
204
Ai River village, North Shifo Township
28
216
Shanxi Province
Lingqiu county
Liushuihe township Zhaobai village
29
223
Loshuihe Township mountain village
30
231
three
Loshuihe township Dajian village
31
238
two
Wuling Town
32
250
four
Tangzhiwa village, Wuling town
33
258
Donghenan town
34
269
35
279
Fanshi County
East Stasis Township
36
287
Dongzhuang Village
37
296
Daying Town
38
304
Jinshanpu township
39
312
Shahe Town
40
321
Jiyizhuang Township
41
331
Guang Yu Bao Township
42
340
three
Chengguan Town
43
349
four
Daixian County
Ekou Town
44
359
Zaolin Town
45
371
three
Chengguan Town
46
383
four
Yangmingbao Town
47
390
Yuanping City
Daying township
48
398
Guoyang Town
49
409
Xue Gu Zhen
50
419
one
Yongxing South Road
Reference materials: [4-5]

Line trend

Jingyuan railway winding in the Taihang Mountains, from Shijingshan South station, across the Yongding River, along the edge of the Taihang hills marching, more tunnels, to the East Yu Temple (Yunju Temple) into the mountains, ten across the Juma River, along the steep terrain, deep canyons, more than the mountain tunnel group. The line passes Zijing Pass, passes Futuyu, enters Shanxi Province through Yimaling in a 7032-meter long tunnel, crosses Tanghe River through Lingqiu Basin, climbs straight to Pingxingguan, and enters the Loess Plateau in northern Shanxi. Pingxingguan tunnel is 6190 meters long, and the exit elevation is 1250 meters, which is the highest point in the whole line. Then gently slope down, along the south bank of the Hutuo River, to Zaolin cross to the north bank straight to the terminus of the original flat, with the Tongpu railway. [1] Jingyuan Railway along the Shidu, Yesanpo, Zijing Pass, Laiyuan and other famous tourist attractions. [2]

Equipment and facilities

broadcast
EDITOR
  • Vehicle facility
As of July 2019, trains running on the Beijing Bureau section of the Jingyuan Railway are mainly used Dongfeng 4D diesel locomotive and HXN5 diesel locomotive ; The trains running in Taiyuan section of Jingyuan Railway are mainly used Harmony 3C electric locomotive .
Among them, the direct passenger train in Beijing bureau section adopts the ordinary type Dongfeng 4D diesel locomotive , to Spirit Hill Station Replace with Harmony 3C electric locomotive ; Through freight trains are mainly used to belong to the Beijing Bureau Huai section HXN5 diesel locomotive . The passenger trains in Beijing Bureau adopt the accelerated passenger type Dongfeng 4D diesel locomotive Goods trains in the tube are used HXN5 diesel locomotive . Both passenger and freight trains in Taiyuan Bureau are adopted Harmony 3C electric locomotive .

Operation situation

broadcast
EDITOR
  • Operation history
On December 31, 1972, the Jingyuan Railway was officially delivered to the Beijing Railway Bureau and put into operation.
In 1982, by Yanshan Petrochemical Financing, will be Nanguancun station to Lianggezhuang station within the section of the Phoenix Pavilion to expand into Yanshan Railway Station .
In 1983, the Beijing Railway Bureau expanded the three boarding and landing stations in Gougezhuang, Dappanshi and Xiaohe into intermediate stations.
In 1988, Taiyuan Railway Branch of Beijing Railway Bureau expanded Wangdongpu Station to Wangdong Bao Station .
In 1989, with the approval of the Ministry of Railways of the People's Republic of China, Shangzhuang Station was renamed Yesanpo Station .
In 1999, with the approval of the Beijing Railway Bureau, the Qinglonghu and Yimaling landing stations were abolished, and the Xiaohe Station was abolished and changed to the Xiaohe landing Station.
On March 18, 2005, Taiyuan Railway Bureau was established, and the section from Lingqiu Station to Yuanping Station belonging to the Datong Railway Branch of Beijing Railway Bureau was managed by Taiyuan Bureau, with the boundary point located at K234 of Jingyuan Railway.
On April 7, 2009, six cars of train 1164, bound for Beijing West Railway Station from Hancheng, Shaanxi Province, derailed while traveling between Gougezhuang and Yesanpo on the Beijing-Yuan Railway. [2]
On December 15, 2009, with the approval of the Ministry of Railways of the People's Republic of China, the station was renamed Bailixia Station.
On October 10, 2011, Train 1164 from Hancheng, Shaanxi Province to West Beijing derailed at Shijingshan South Station and was unable to continue, but fortunately no casualties were caused. [6]
In March 2016, the electrification transformation project of the tube section of Jingyuan Railway Taiyuan Bureau began construction, with a total length of 174.29 kilometers, and the transformation range is from Shanxi Yuanping Station to Datong Lingqiu Station, involving tunnel disease rectification, station yard transformation, bridge reinforcement and culvert.
On January 1, 2018, the electrification transformation project of the tube section of the Taiyuan Bureau of Jingyuan Railway was put into operation. [3]
As of April 2019, there are only four passenger train pairs on the Jingyuan Railway: K601/602 (Beijing - Taiyuan), K603/604 (Beijing - Yuncheng), 6437/6438 (Beijing West - Dajian) and 8817/8818 (Lingqiu - Taiyuan).

Construction achievement

broadcast
EDITOR

Technical problem

The geology of the mountainous area through which the Jingyuan Railway passes is extremely complicated, and the strata are often fractured, and the rocks are crushed and easy to collapse. The seismic intensity along the line is 6 to 8 degrees. The river along the perennial flow, not navigable, flood period water rush, fluctuation range is large; Tributaries are generally intermittent rivers. The climate along the route is affected by the northwest high pressure belt, which is hot and rainy in summer and dry and cold in winter with an average temperature of 11.8 to 6.8 degrees Celsius, the highest temperature of 40.5 degrees Celsius and the lowest temperature of minus 28.2 degrees Celsius. The average annual rainfall is 490 to 740 mm. [1]

Key project

The main project of the railway is the Yongding River Bridge, with a total length of 836 meters, which is the longest bridge in the whole line. Yimaling Tunnel, with a total length of 7,032 meters, was the longest railway tunnel in China in the 1970s; Pingxingguan Tunnel, a total length of 6190 meters, tunnel exit elevation 1250 meters, is the highest point in the whole line. [1]

Honor received

broadcast
EDITOR
On September 13, 2023, it was selected into the third batch of China's Industrial Heritage Protection list. [9]

Construction planning

broadcast
EDITOR
According to the news released by Beijing Urban Railway Investment and Development Co., Ltd. on January 2, 2019, for the Jingyuan Railway, which runs through Fangshan and connects Shidu and other scenic areas, Beijing has reached an agreement with the railway department, and the construction of the suburban railway Jingyuan Line will be promoted in the future, and the preliminary research is being carried out. In the future, after the opening of the suburban railway Jingyuan Line, it will communicate the southwest and the central city, become a commuter express, and become a channel of characteristic cultural leisure tourism along the line, and will also become the lifeline of the mountain area. [7]
On December 12, 2019, the Beijing Municipal Development and Reform Commission held a media interpretation meeting on the progress of the implementation of the South Action Plan (2018-2020), and the relevant person in charge of the Municipal Development and Reform Commission introduced that the western extension of the deputy Central Line of suburban railway and the Jingyuan Line are being demonstrated. [8]

Value meaning

broadcast
EDITOR
The Jingyuan Railway is a main railway line between the capital and Shanxi Province. During the construction of the railway, due to the rapid development of the national economy and the needs of national defense construction, twenty special lines were built along the line, and the construction of factories and mines in Lianggezhuang and Futuyu developed rapidly. The completion of the Beijing-Yuan Railway is of great significance to strengthening the war readiness of the capital, developing the mountainous areas of Hebei and Shanxi provinces, and accelerating the socialist economic construction. (Review of a Brief History of the Construction of the Keihara Railway) [1]