Beijing Winter Olympic Village

One of the main non-competitive venues for the Beijing Winter Olympic and Paralympic Games
Collect
Check out my collection
0 Useful +1
0
Beijing Winter Olympic Village ( Beijing Winter Olympic Village ), located in Beijing Chaoyang District In the South Olympic Sports Culture Business Park, Aotizhong Road, 2022 Beijing Winter Olympic Games One of the largest non-competitive venues for the Winter Paralympics, with a total construction area of about 386,600 square meters, mainly for athletes to provide accommodation, catering, medical treatment and so on service . [3-4] [8]
The Beijing Winter Olympic Village consists of three functional areas: operation area, residential area and square area. The main body is composed of 20 apartment buildings with 13 to 17 floors. The highest level is 17 floors and the building height is 60 meters. The overall structure is underground reinforced concrete structure and above ground Prefabricated steel structure Buildings. [1]
On January 18, 2022, the Beijing Winter Olympic Village (Winter Paralympic Village) officially launched closed-loop management and entered the state of competition. [12] On January 27, the Beijing Winter Olympic Village was officially opened. [17] During the Winter Olympics, the Beijing Winter Olympic Village will host nearly 1,700 athletes and team officials from 44 countries and regions [20] . On April 17, 2022, the Beijing Winter Olympic Village opened to the public for the first time after the competition, and the first group of visitors were the builders of the Winter Olympic Village and their families, a total of about 160 people.
On September 29, 2022, the renovated Beijing Winter Olympic Village was officially opened to the public. [22]
Chinese name
Beijing Winter Olympic Village
Foreign name
Beijing Winter Olympic Village
Geographical position
Beijing Chaoyang District Aoti Road South Olympic Culture Business Park
Service time
June 26, 2021
Opening hours
January 27, 2022 [17] (Official village opening)
Floor area
386600 m²

Construction history

broadcast
EDITOR
On December 29, 2017, the Beijing Winter Olympic Village project was officially built Activate. [2]
On July 21, 2019, the underground structure of the first section of the Beijing Winter Olympic Village project was capped, and the construction of the Winter Olympic Village project entered the steel structure construction stage Paragraph. [1] [3]
On December 3, 2019, the main structure of the Beijing Winter Olympic Village project was completely capped . [6]
On June 26, 2021, the Beijing Winter Olympic Village was fully completed and officially delivered to the Beijing Winter Olympic Organizing Committee Yes. [5]
On January 23, 2022, the Beijing Winter Olympic Village will be pre-opened; On January 27, the Beijing Winter Olympic Village will be officially opened to welcome athletes from all over the world. On February 2 of the same year, the torch relay will be carried out to kick off the Beijing Winter Olympics.
On January 18, 2022, the Beijing Winter Olympic Village started closed-loop management and officially entered the state of competition. [11]
On January 23, 2022, the Beijing Olympic Village pre-opened, and the delegation entering the village on the first day had the Chinese delegation's advance person A member. [13]
On January 27, 2022, the Winter Olympic Village (Winter Paralympic Village) in the three competition zones will be officially opened. [14]
On January 25, 2022, the Beijing Winter Olympic Village polyclinic opened Examine. [15]
On January 27, 2022, Zhangjiakou Winter Olympic Village officially opened, and delegations from various countries will move into the village one after another. [16]
On January 27, 2022, the Winter Olympic Villages of Beijing, Yanqing and Zhangjiakou in the three regions of the Beijing Winter Olympic Games officially opened. National men's ice hockey team and women's National ice hockey team Beijing Winter Olympic Village. The national cross-country ski team, the national freestyle ski moguls team, the national biathlon team and the national snowboard horizontal giant slalom team settled in Zhangjiakou Winter Olympic Village. [19] [21]
On April 17, 2022, the Beijing Winter Olympic Village opened to the public for the first time after the competition, and the first group of visitors were the builders of the Winter Olympic Village and their families, a total of about 160 people.
On September 29, 2022, the transformed Beijing Winter Olympic Village was officially opened to the public, turning it into a sports and leisure park and a venue for the Winter Olympic heritage [22] .
Night view of Beijing Winter Olympic Village

Architectural pattern

broadcast
EDITOR

summarize

The Beijing Winter Olympic Village consists of three functional areas: operation area, residential area and square area. The main body is composed of 20 apartment buildings with 13 to 17 floors, the highest 17 floors, the building height of 60 meters, and the underground garage, a total of 3 Floor, total construction area of about 386,600 square meters. [1]
公寓内景 公寓内景 公寓内景
Apartment interior view

Reception center

Beijing Winter Olympic Village Delegation Reception Center (TPC) is the first stop for athletes and team officials arriving at the Winter Olympic Village, including athlete registration, national (regional) Olympic Committee services, accommodation and other business areas. In order to improve the efficiency of delegation members' business handling and access, and minimize the risk of cross-infection, the reception center is activated according to the registration card of delegation members. The reception streamline window is classified and planned, the verification point channel is strictly regulated with a 1-meter line isolation bar, and the epidemic prevention isolation board is provided Let's wait. [9]
Reception center

Fitness center

The Beijing Winter Olympic Village Fitness Center is divided into two floors with a total construction area of 2000 square meters. The first floor is mainly divided into cardiovascular function training area, spinning area, sports performance area and linear acceleration area. The second layer is mainly divided into free strength training area, stretching area and force Measure area. [9]
Fitness center

Living quarters

Beijing Winter Olympic Village is divided into east and west areas. It is mainly composed of 20 orange and silver apartment buildings, which can provide 2234 rooms and the maximum bed can reach 2338. The apartment is mainly divided into 135 square meters, 165 square meters, 190 square meters, 220 square meters of four units, a total of 2 bedrooms, 1 conference room, 1 office, 3 bathrooms, 1 guest Hall. [7]
Living quarters
Beijing Winter Olympic Village apartment building is divided into different Spaces, with ordinary athletes bedroom, head bedroom and office, conference rooms, functional areas, mainly to meet the meeting and negotiation of delegations in addition to life Interfunction. [7]

Architectural feature

broadcast
EDITOR

Structural feature

The design concept of the residential area of Beijing Winter Olympic Village comes from the courtyard form of Beijing Four courtyards. 20 buildings are enclosed into 6 to 7 courtyards, among which 2 are relatively large courtyards, and the other several buildings are each formed into small courtyards. Through the enclosed and open space changes, the community sense of belonging of "buildings with gardens and households with views" is formed. The two central green Spaces feature landscaped landscapes that blend in with the Qing Dynasty Qianlong Elements of "Ice Hippie Map" from the year before. The roof of the building is equipped with green and light-heat equipment, which is not only beautiful but also can provide heat source for 24 hours hot water; Light pipe is laid on the upper part of the green space, and the garage is illuminated by sunlight. Full coverage of 5G signals in communication; The underground space of the residential area and the opposite square area is equipped with a connecting corridor to facilitate access to various commercial facilities between . [3] [7] [18]
Exterior view of Beijing Winter Olympic Village

Environmental protection construction

Beijing Winter Olympic Village adopts prefabricated construction to reduce on-site wet work. Based on BIM technology statistics and analysis, low-carbon construction materials and equipment are selected, and energy consumption monitoring platform is used to carry out statistical management of carbon emissions in the park and building operation. In terms of energy utilization, the project adopts an efficient enclosure structure to build the medical room for the Beijing Winter Olympics into an ultra-low energy consumption building, and the proportion of domestic hot water provided by renewable energy exceeds Seventy percent. [6]

Value meaning

broadcast
EDITOR
During the games, the Beijing Winter Olympic Village will provide accommodation, food and medical services for athletes and team officials from various countries. After the games, the Beijing Winter Olympic Village will be used as a public rental house for talents in Beijing who meet the strategic positioning of the capital city . [10]

Visit information

broadcast
EDITOR

Geographical position

The Beijing Winter Olympic Village is located Beijing Chaoyang District Aotizhong Road South Olympic Culture Business Park. [8]
Beijing Winter Olympic Village

Traffic line

Take Beijing bus No. 839, 510, 753, 328, 379, 419, 425, 484, 518, 628, 751, 836, 851, 913, 949, 963, 110 and get off at Waoli Nankou Station or Olympic Park Station.