Company name: Weihai Water Conservancy Engineering Group Co., LTD
Name of the unit project (construction site) | Total score (Full score is worth 100 points) | Item name and score | ||||||||||||||
Safety Management (full score: 20) | Civilized construction (full score: 20) | Foundation pit engineering (out of 10) | Template stand (out of 10) | High work (out of 10) | Electricity for construction (out of 10) | Hoisting (out of 10) | Construction equipment (out of 10) | |||||||||
Reviews: | ||||||||||||||||
Inspection department | Person in charge | Item under inspection | Project manager | |||||||||||||
Safety management inspection rating sheet
Serial number | Check item | Deduct the mark | Earned points | Deduction points | Earned score | |
1 | Warranty item | Safety production responsibility system | Failure to establish the safety production responsibility system deducted 10 points. Failure to confirm the safety production responsibility system with the signature of the responsible person deducted 3 points. Failure to develop the safety technical operating procedures for each type of work deducted 10 points. Failure to provide full-time safety officers as required deducted 10 points. Failure to specify the safety production assessment indicators in the contract of the project department deducted 8 points Failure to prepare safety fund use plan and implementation deduction of 2 ~ 5 points for failure to develop safety management objectives (casualty control, safety standards, civilized construction) deduction of 5 points for failure to decompose safety responsibility objectives deduction of 5 points for failure to establish safety production responsibility system, responsibility target assessment system deduction of 5 points for failure to regularly assess managers according to the assessment system deduction of 2 ~ 5 points | 10 | ||
2 | Construction organization plan | If safety measures are not formulated in the construction organization design, 10 points will be deducted from the high-risk division and sub-project without preparing safety special construction plans. 3 ~ 8 points deducted 10 points for construction organization design without expert demonstration of the special plan according to regulations, 10 points deducted for safety measures without approval of the special plan, 6 ~ 8 points deducted for not organizing and implementing the special plan according to the plan and 5 ~ 10 points deducted | 10 | |||
3 | Safety technology delivery | 10 points will be deducted for failure to take written safety technical disclosure and 5 points will be deducted for failure to do division-specific disclosure and 3-5 points will be deducted for incompleteness of disclosure and 4 points will be deducted for failure to perform signature procedures and 2-4 points will be deducted | 10 | |||
4 | Safety inspection | Failure to establish a safety inspection (regular and seasonal) system deducted 5 points for failing to keep regular and seasonal safety inspection records deducted 5 points for failing to fix personnel, set time and set measures deducted 2 ~ 6 points for failing to rectify and review the items listed in the notice of major accident hidden dangers on time deducted 8 points | 10 | |||
5 | Safety education | Failure to establish safety training and education system deducted 10 points New workers do not carry out three-level safety education and assessment deducted 10 points for not specifying the specific safety education content deducted 6 to 8 points for not carrying out safety education when changing types of work deducted 10 points for construction management personnel and full-time safety officers who do not carry out annual training and assessment according to regulations deducted 5 points | 10 | |||
6 | Emergency plan | 10 points will be deducted for failing to formulate emergency plans for work safety. 3-6 points will be deducted for failing to establish emergency rescue organizations and provide rescue personnel. 5 points will be deducted for failing to provide emergency rescue equipment and 5 points will be deducted for failing to carry out emergency rescue drills | 10 | |||
subtotal | 60 | |||||
7 | A general item | Safety management of subcontractor | The subcontractor's qualification, qualification and subcontracting procedures are incomplete or invalid, 10 points will be deducted for failing to sign the safety production agreement, 5 points will be deducted for the subcontracting contract and safety agreement, and 2 ~ 6 points will be deducted for failing to establish a safety organization and provide safety personnel in accordance with the regulations | 10 | ||
8 | Special operation certificate to work | One person engaged in special operations without training is deducted 4 points. One special operations person's qualification certificate is not extended for review is deducted 4 points. One person is deducted 2 points for not holding the operation certificate | 10 | |||
9 | Handling of production safety accidents | Failure to report production safety accidents according to regulations will be deducted 3 ~ 5 points. Failure to investigate and analyze production safety accidents according to regulations will be deducted 10 points. Failure to apply for work-related injury insurance will be deducted 5 points | 10 | |||
10 | Safety sign | 5 points are deducted for failure to hang safety signs in major construction areas, dangerous sites and facilities according to regulations. 5 points are deducted for failure to draw the general plan of site safety signs layout. 5 points are deducted for failure to adjust the setting of safety signs according to changes in sites and site facilities | 10 | |||
subtotal | 40 | |||||
Total inspection items | 100 |
Civilized construction inspection rating table
Serial number | Check item | Deduct the mark | Earned points | Deduction points | Earned score | |
1 | Guarantee item | Field enclosure | 10 points are deducted for the failure to install a closed fence higher than 2.5m around the construction site of major road sections in urban areas. 10 points are deducted for the failure to install a closed fence higher than 1.8m around the construction site of general road sections.5 ~ 7 points are deducted for the failure to install a fence continuously around the construction site | 10 | ||
2 | Closed management | 3 points will be deducted if no gate is set up at the entrance and exit of the construction site. 3 points will be deducted if no guard is set up or no guard system is set up. 3 points will be deducted if no work card is worn when entering the construction site. 3 points will be deducted if no enterprise name or logo is marked at the entrance and exit of the construction site and no vehicle washing facilities are set up | 10 | |||
3 | Construction site | 5 points are deducted if the main roads on site are not hardened. 5 points are deducted if the roads on site are not unblocked or the roads are uneven and solid. 5 points are deducted if the dust prevention measures taken during site operations, transportation, and storage of materials are not complete or unreasonable. 5 points are deducted if the drainage facilities are not complete or the drainage is not smooth. 4 points are deducted if the measures to prevent the outflow of mud, sewage, or waste water or block the sewers and drainage channels are not taken 2 points are deducted for not setting up smoking places and smoking freely. 3 points are deducted for not carrying out green layout in warm season | 10 | |||
4 | Field material | Construction materials, components, and materials are not placed according to the general layout code 4 points deducted 2 points for unreasonable material layout, irregular stacking, not marked names, and specifications. 5 points deducted for not using reasonable equipment or randomly throwing in the air. 3 points deducted 4 points for flammable and explosive materials not taking protective measures or storing them in different categories | 10 | |||
5 | On-site accommodation | 8 points will be deducted for the construction work area, the material storage area and the office area, and the living area can not be clearly divided. 6 points will be deducted for the dormitory that does not have an openable window. 4 points will be deducted for the dormitory that does not have a bed, the bed is more than 2 layers, the use of a whole bed, the passage is not set up, or the personnel is overstaffed. 6 points will be deducted for the dormitory that does not take measures to keep warm and prevent gas poisoning 5 points will be deducted if the dormitory fails to take measures to cool down the summer and prevent mosquitoes and flies | 10 | |||
6 | On-site fire prevention | 10 points will be deducted if the materials and site selection of temporary facilities on site do not meet environmental protection requirements, 8 points will be deducted if flammable materials are placed randomly, unreasonable layout and configuration of fire extinguishing equipment or failure of fire extinguishing equipment, 5 points will be deducted if fire fighting water source (high-rise building) is not set up or cannot meet fire fighting requirements Failure to go through the fire approval procedures or no fire monitor will deduct 5 points | 10 | |||
subtotal | 60 | |||||
7 | Comprehensive control of public security | The living area does not set up learning and entertainment places for the operators to deduct 4 points. The public security system is not established, and the responsibility is not broken down to the person deduct 3 to 5 points. The public security prevention measures are unfavorable, and 3-5 points are often deducted in the event of theft | 8 | |||
8 | General item | Construction site sign | The content of the "five cards and one picture" set up at the gate is incomplete, the lack of an item is deducted 2 points, the lack of a standard sign is deducted 3 points, the lack of a safety slogan is deducted 5 points, the lack of a publicity bar, the newspaper column, and the blackboard newspaper are deducted 4 points | 8 | ||
9 | Living facilities | The distance between the canteen and the toilet, garbage station, toxic and harmful places is deducted 6 points. The canteen fails to apply for the hygiene permit or fails to apply for the health certificate of the cooking staff. The canteen is deducted 5 points. The gas tank used in the canteen is not equipped with a separate storage room or the storage room is poorly ventilated. The canteen is deducted 4 points 6 points are deducted if the number or layout of toilets does not meet the needs of on-site personnel. 4 points are deducted if the toilets do not meet the hygiene requirements. 8 points are deducted if the shower room is not set up or the shower room cannot meet the needs of on-site personnel. 4 points are deducted if the hygiene responsibility system is not established, and the household garbage is not packed or cleaned up in time | 8 | |||
10 | Health first aid | If no corresponding emergency plan is formulated on site, or the actual operation of the plan is poor, 6 points will be deducted. If trained first aid personnel or first aid equipment are not set up, 4 points will be deducted. If hygiene prevention and disease publicity and education are not carried out, or necessary protective equipment is not provided, 4 points will be deducted | 8 | |||
11 | Community service | 8 points are deducted for unauthorized construction at night. 8 points are deducted for burning all kinds of waste at the construction site. 5 points are deducted for not taking measures to prevent dust, noise and light pollution | 8 | |||
subtotal | 40 | |||||
Total inspection items | 100 |