ISO50430 certification system


In order to further improve the quality management level of construction enterprises, provide high-quality buildings for the society, and meet the professional needs of quality management in the field of construction, The National Certification and Accreditation Administration and the Ministry of Housing and Urban-Rural Development decided to apply the "Quality Management Standards for Engineering Construction Enterprises" (GB/T50430:2007) in the quality management system certification in the field of construction. The certification standards for engineering construction enterprises to obtain certification certificates should be GB/T19001-2008/ISO9001:2008 and GB/T50430:2007. The "Quality Management Code for Engineering Construction Enterprises" is a recommended national standard issued on October 23, 2007, and officially implemented on March 1, 2008. It is the first national standard about the quality management of engineering construction enterprises. Relative to technical standards and technical specifications, it is also the first management specification about the quality management of construction enterprises.

Since January 1, 2011, in the field of engineering construction quality management system certification, in accordance with the "Quality management system requirements" (GB/T19001-2008) and GB/T50430:2007 "Quality Management standards for Engineering construction enterprises" to carry out certification activities.

Second, construction enterprises engaged in construction activities shall implement all the requirements of the "Quality Management Code for Engineering Construction Enterprises", encourage the use of qualified third-party certification, the content of the certification should include the "quality management system requirements" and "GB/T50430:2007" "Quality Management Code for Engineering Construction Enterprises" requirements, The authorities will take the results more seriously.

Third, since January 1, 2011, all certification bodies in China to the construction enterprise quality management system certification, should be in accordance with the "quality management system requirements" and "GB/T50430:2007" Construction Enterprise Quality Management standards "to carry out certification audit activities.

4. China National Accreditation Center for Conformity Assessment shall revise the accreditation requirements for the professional scope of construction in accordance with the requirements of GB/T50430:2007 "Quality Management Standards for Engineering Construction Enterprises", and re-evaluate and confirm the certification bodies with the professional scope of construction from September 1, 2010. Those who meet the conditions will continue to be granted corresponding accreditation qualifications.

5. After re-approval, the certification body with the professional scope of construction recognition has obtained the quality management system certification in accordance with the "Quality management system requirements" standard, at the expiration of the renewal of the certificate, it should add the "GB/T50430:2007" "Quality Management standards for Engineering Construction Enterprises" requirements to complete the conversion of certification; The certificates that are not converted within the time limit are invalid, and the certification body shall deal with the invalid certificates accordingly.

6, in accordance with the "quality management system requirements" and GB/T50430:2007 "Engineering construction Enterprise quality Management standards" implementation of the certification activities, certification certificate certification standards should be :GB/T19001-2008/ISO9001:2008 and GB/T50430:2007.

7, according to ISO9001:2008 "Quality Management system requirements" and GB/T50430:2007 "Engineering construction enterprise quality Management standards" implementation of certification activities, It can still be combined with GB/T24001/ISO14001 environmental management system and GB/T28001/OHSAS18001 occupational health and safety management system to establish an integrated management system of quality, environment and occupational health and safety.

foldEdit this paragraphCharacteristic of standard

The promulgation of GB/T50430:2007 "Quality Management Standards for Engineering construction enterprises" aims to further strengthen and implement quality responsibility by promoting the full implementation of construction enterprises, improve the level of enterprise self-discipline and quality management, and promote the scientific, standardized and legalized quality management of construction enterprises. As the first management standard for the quality management of construction enterprises, the "Quality management Code for Engineering Construction Enterprises" has the characteristics of advanced nature, guidance and flexibility, which are specifically manifested in:

1) The basic idea of GB/T50430:2007 is consistent with the ISO9000 series standards, and fully covers the requirements of ISO9001 standards in content;

2)GB/T50430:2007 fully embodies the characteristics of construction enterprise management activities in the structure of the provisions, highlighting the process method and PDCA thought;

3)GB/T50430:2007 combined with the characteristics of construction industry management, on the basis of ISO9001 standards and put forward many further requirements;

4)GB/T50430:2007 localization, industry characteristics, concise and clear language, easy to implement;

5)GB/T50430:2007 is consistent with the current management mode of the construction industry in China, and the construction enterprise will not increase the burden when implementing, but reduce the formal operation caused by the misunderstanding of the enterprise ISO9000 standard, and reduce the burden.

6)GB/T50430:2007 closely combines the requirements of the current construction management laws and regulations issued in China, so as to promote the process of legalization of project construction management through the implementation of the specification;

7) The preparation of GB/T50430:2007 is not from the narrow "quality" perspective, only limited to engineering (product) quality control, but from the perspective of all quality behaviors related to engineering quality, that is, the concept of "high quality", which fully covers all quality management activities of enterprises;

8)GB/T50430:2007 is the basic requirements for quality management of construction enterprises, and is not the highest level of quality management of enterprises. Therefore, at the same time of ISO50430:2007, enterprises are encouraged to carry out management innovation according to the needs of their own development, such as the implementation of excellent performance model, so as to enhance the competitiveness of enterprises.

Main content

Ocular order

1 General Rules

2 Terms

3 Basic requirements of quality management

3.1 General Provisions

3.2 Quality Policy and quality objectives

3.3 Planning and establishment of quality management system

3.4 Implementation and improvement of the quality management system

3.5 File Management

4 Organization and responsibilities

4.1 General Provisions

4.2 Organization

4.3 Responsibilities and Rights

5. Human Resource management

5.1 General Provisions

5.2 Human Resource configuration

5.3 Training

6. Management of construction tools

6.1 General Provisions -

6.2 Construction equipment

6.3 Use of construction tools

7. Bidding and contract management

7.1 General Provisions

7.2 Bidding and signing

7.3 Contract Management

8 Building materials, components and equipment management

8.1 General Provisions

8.2 Procurement of building materials, components and equipment

8.3 Acceptance of building materials, components and equipment.

8.4 Site management of building materials, components and equipment

8.5 Construction materials, components and equipment provided by the Employer

9 Subcontract Management

9.1 General Provisions

9.2 Selection of subcontractors and subcontracting

9.3 Control the implementation process of the subcontracted project

10 Project construction quality management -

10.1 General Provisions

10.2 Planning

10.3 Construction Design

10.4 Construction Preparations

10.5 Quality control of construction process

10.6 Services

11 Construction quality inspection and acceptance

11.1 General Provisions

11.2 Construction quality inspection

11.3 Construction quality acceptance

11.4 Handling of construction quality problems

11.5 Detection Device Management

12 Quality management self-inspection and evaluation

12.1 General Provisions -

12.2 Supervision, inspection and evaluation of quality management activities

13 Quality information and quality management improvement

13.1 General Provisions

13.2 Collection, transmission, analysis and utilization of quality information

13.3 Quality management improvement and innovation

The wording of this specification

Appendix: Article description

foldEdit this paragraphData archiving

foldCivil part

1. Before commencement (data with commencement conditions): construction permit (provided by the construction unit), construction organization design (including application form and approval form), commencement report (application for approval), engineering geological survey report, construction site quality management inspection record (application for approval), measurement and pay-off (application for approval), 2. Foundation construction stage: steel bar sampling and sample delivery (various specifications of steel bars specified on the drawing), earthwork excavation (earthwork excavation scheme, technical disclosure, foundation inspection records, concealment, inspection and approval), cushion layer (concealment, concrete construction inspection and approval, pay-off record, review of pay-off technology), foundation (steel bar raw materials, inspection report, inspection and approval). Steel bar, formwork, concrete construction scheme, technical disclosure, steel bar concealment, steel bar, formwork inspection batch, line setting record, technical review, concrete concealment, concrete construction inspection batch, standard maintenance, same conditions and mold test block removal), foundation brick wall (scheme, technical disclosure, mortar mix ratio in advance, concealed, inspection batch, mortar test block), template removal (mold test block removal report for approval, Concealed, inspection lot), earthwork backfill (scheme, technology disclosure, concealed, inspection lot, earthwork compactness test). 3, the main construction stage: a layer of structure (plan, technical disclosure basis has been included, steel raw materials, inspection report for approval, flash butt welding, electroslag pressure welding sampling, sample delivery, steel concealed, steel, template inspection batch, template technical review). 4, decoration stage: floor tiles, ceiling materials, doors and Windows, paint and other decoration should be retested in advance, until the test report comes out and the supervision review is passed before construction (plan, technology disclosure, concealment, inspection and approval). 5, roof construction stage: waterproof coil and other major materials should be retested in advance, and can enter the roof construction stage (plan, technology disclosure, concealment, inspection and approval) after the retest report is issued. 6. Collection of quality assurance data: suppliers should be required to provide complete quality assurance data for material entry, steel bar entry data (national industrial production license, product quality certificate), cement (production license, cement certificate, 3-day, 28-day factory inspection report, filing certificate, and on-site material use acceptance certificate for trading), brick (production license, brick certificate, etc.) Record certificate, factory inspection report, transaction certificate, site material use acceptance certificate), yellow sand (production license, quality certificate, transaction certificate Site material use acceptance certificate), stone (production license, quality certificate, transaction certificate site material use acceptance certificate), doors and Windows (production license, quality certificate, four sex test report, Certificate of acceptance certificate for the use of on-site materials), waterproof materials (production license, quality certificate, factory inspection report), welding materials (quality certificate), glass (glass quality certificate), finishing materials (quality certificate), materials that are designed and required to be re-tested after entering the market shall be re-tested in a timely manner. The data should be consistent with the incoming materials and should be consistent with the design requirements. 7. Materials that should be re-tested: steel bar (tensile and bending test, representative quantity :60t/ lot), cement (3 days, 28 days, representative quantity :200t/ lot), brick (re-test, representative quantity: 150,000 / lot), yellow sand (re-test, 600t/ lot), stone (re-test, representative quantity :600t/ lot), doors and Windows (re-test), Waterproof material (retest), finishing material (retest)8, backfill soil should be done compactness test, indoor environment should be tested and issued a report. 9, concrete test block: concrete test block should be placed in a group of 100m3 per pouring (less than 100m3 is a group), continuous pouring more than 300m3 can be appropriately reduced, each pouring part should be retained, the same conditions and tear test block. Standard maintenance means that the test block is placed under the conditions of standard temperature and humidity for maintenance (indoor temperature is constant at 120 ° C ±3 ° C) for 28 days for test, the same condition means that the test block is placed on the site for natural maintenance, when the cumulative outdoor temperature reaches 600 ° C/day, the removal test block means that it is maintained under the conditions of natural maintenance for 7 days. 10, mortar test block: every day, each floor, each part should be retained a group, under standard conditions for 28 days to test. 11, inspection batch: construction engineering quality acceptance is generally divided into unit (sub-unit) engineering, division (sub-division) engineering, sub-project and inspection batch. Before the first process of inspection, the inspection batch should be divided (can be divided according to the axis, etc.).

foldEnergy-saving insulation part

1, according to the 2007 new version of the energy-saving insulation code "GB/T50411-2007" requirements, building engineering energy-saving insulation data should be independently set up, insulation materials (such as insulation mortar, anti-cracking mortar, mesh cloth, extruded board and other materials in addition to providing warranty, factory inspection report should also be retested according to batch. The construction of energy saving and heat preservation (plan and technology disclosure, concealment, inspection and approval) shall be carried out after the re-test report is submitted to the supervision and passed. 2, insulation mortar according to the requirements of the code should be retained in the same condition test block (detection of thermal conductivity, dry density and compression strength), each test batch should be sampled to make the same condition curing test block no less than 3 groups. (See "GB/T50411-2007" quality acceptance code for building energy conservation and insulation engineering for details). 3, the bonding strength of the insulation board and the base should be field-drawn test, and the thickness must meet the design requirements.

foldSteel structure part

1, the steel structure project should have the data: construction organization design (including application form, approval form), start report (start report), quality personnel qualification certificate (collection report), special work certificate (collection report). 2, steel structure production stage: according to the drawings, the main material of important components should be retested, the appearance inspection of the first and second welds should be carried out (all), and the ultrasonic non-destructive testing test should also be done (10% spot check), and the inspection of the production work of the components can be reported (assembly, welding, painting) after the non-destructive testing is reported. All materials must be submitted to the supervisor before the process inspection, otherwise the supervisor may refuse to apply for all processes involved in the inspection. 3, steel structure installation: issue a first and second weld non-destructive testing report (formal report), do a good job of the basic axis check and elevation measurement work, and report to the supervisor (please accept the supervisor), all processed components must have a component factory certificate and signed by the processing site supervision acceptance. Large hexagonal high-strength bolts of different specifications should be tested according to the anti-slip coefficient of the friction surface in batches (3000t/ batch), when the safety level of the design structure is a level, the steel used in the main stress components of the long-span steel structure (such as Angle steel, H-shaped steel, etc.), the steel designed to require re-test should be tested for raw materials, and can be used after the re-test. Fire retardant coatings should be retested. 4, steel structure materials: welding materials (check the quality of welding materials certification documents, Chinese signs and inspection reports, etc. The welding materials used in important steel structures should be sampled for reinspection, and the reinspection results should meet the current national product quality standards and design requirements. Large hexagonal high-strength bolts (10.9 high-strength bolts shall have a hardness of HRC32-36 and shall not have cracks or damage. Welding ball (weld should do ultrasonic non-destructive testing, should meet the design requirements, if there is no design requirements should meet the "GB50205-2001" specification of the secondary standard).