canopy buildings have many advantages and are flexible, which can be flexibly used in many industries
cultural and entertainment places:theaters, cultural centers, amusement parks, etc;exhibition venues:exhibition center, exhibition hall, museum;
비즈니스 places:shopping malls, shopping centers, trade centers, etc;
agro-ecological sites:agro-ecological gardens, botanical gardens, large greenhouses, etc;
(영어) military and emergency sites:temporary shelters, command centers, temporary disaster relief hospitals, etc;
traditional reinforced concrete buildings와 비교
the construction cost of air dome should be reduced by more than 30%.
the air dome building is mainly supported by the internal air pressure, and its dead weight is very low.
it can easily achieve a large span of more than 100 meters.
the air dome building has simple structure, convenient construction and low requirements on the ground.
(영어) the characteristics of secondary construction and even multiple disassembly
the air dome building is supported by wind pressure and has no beams and columns inside.
strong wind and snow resistance
"the air dome building has light weight and does not need complex foundation treatment".
generally, it only takes about 20-30 days from production to installation.
gs 에어돔 is an enterprise that focuses on research, development,(영어) design as well as production of air supported membrane structure (영어)a case supplier of air dome product solutions.
gs has worked in the field of mobile construction for 17년and has accumulated experience in thousands of customers service and thousands of projects.5만 제곱미터 (5만 제곱미터):maximum service area of nearly 5만 square meters.
gs 에어돔의 주요 plant of gs air dome is large aer-film building2004년 10월 1일에 확인함."can accommodate four olympic standard swimming pools".
"the air dome building does not need complex foundation treatment"and can be completed in 15 days under normal circumstances, your construction costs effectively reducing.
중국 북부에 위치한 회사."the large number of data collection".(영어) systematic experiments and technical breakthroughs, the products can cope with low temperature (영어)10 degrees of strong wind and 50 cm of snow.
high mountain air dome technology r&d personnel and external construction team have a large number of people whom areconduct on-on-one consultation and customization and have rich construction experience."고 기술적으로 말했다.