China government network

Reply summary

  • [04-29]There is a conflict between the assessment grade of the geological disaster prevention Unit and the assessment grade of the Geological disaster Risk Assessment Standard

  • Name: Mr. / Ms. Kang id number: 362 * * * * * * * * * * * * * * email: 573 * @ * * * * * tel: 153 * * * * * * address: xiamen, * * * * * * * * * * * * consultation: "Geological disaster prevention Unit Qualification Management Measures" (adopted at the Second Ministerial meeting of the Ministry of Natural Resources on October 27, 2022) Article 9 Geological disaster risk assessment projects are divided into two levels (no three levels). However, Article 4.6.1 of the Geological Disaster Risk Assessment Standard (GB/T 40112-2021) divides the geological disaster risk assessment into one, two and three levels, which conflicts with the "qualification management Measures". Which should be used in the evaluation of specific projects? Reply: Hello! Article 9 of the Measures for the Qualification Management of Geological Disaster Prevention Units (Decree No. 8 of the Ministry of Natural Resources) provides for the classification of geological disaster risk assessment projects, with the purpose of clarifying the scope of projects contracted by Grade A and Grade B qualification units. The Code for Risk Assessment of Geological Hazards (GB/T 40112-2021) is applicable to the risk assessment of geological hazards such as landslide, collapse, debris flow, karst collapse, mining subsidence, ground cracks, land subsidence and unstable slopes during the feasibility study stage of various engineering construction and planning in geological disaster-prone areas. The classification of geological disaster risk assessment in the standard is different from the classification of projects in the qualification management measures. Risk assessment projects contracted by geological disaster prevention units shall be implemented in accordance with the relevant provisions of Article 9 and Article 11 of the Measures for the Qualification Management of Geological disaster Prevention Units (Decree No. 8 of the Ministry of Natural Resources), and the technical standards for geological disaster risk assessment shall be implemented in accordance with national standards. (Division of Geological Exploration Management) 2024-04-29 10:05:20
  • [04-02]Registration of prospecting right

  • Name: Mr. / Ms. Li id number: 370 * * * * * * * * * * * * * * email: JND * @ * * * * * tel: 150 * * * * * * address: shandong province * * * * * * * * * * * * consultation: In October 2023, our bureau publicly listed the sale of a cement limestone mine exploration right with an area of 0.65 square kilometers. The down payment of the sale proceeds has been paid according to the contract, and the remaining part will be paid in installments when the mining right is transferred. Currently, due to objective reasons of local policies, 0.3 square kilometers within the transfer area can not handle the registration procedures of exploration rights for the time being. Our bureau intends to handle the certificate of exploration rights within 0.35 square kilometers of the conditions first, and handle the formalities of changing the exploration rights (expanding the scope of exploration blocks) or another new procedure of exploration rights when the conditions are mature. Is it OK? Reply: Hello! Opinions of the Ministry of Natural Resources on Several Matters concerning Deepening the Reform of Mineral Resources Management (Natural Resources Regulation [2023] No. 6) III. Actively promoting the transfer of "net ore" stipulates: If it is impossible to carry out exploration and mining operations due to force majeure, the competent department of natural resources may modify or terminate the contract, withdraw the mining right in accordance with law, and return the proceeds from the transfer of the mining right that have been collected in accordance with relevant provisions. (Department of Mineral Rights Management) 2024-04-02 19:05:13
  • [02-27]Consultation on the index issues related to the Control Index of Industrial Project Construction land

  • Net: ding, Mr. / Ms. Id number: 430 * * * * * * * * * * * * * * email: din * @ * * * * * tel: 181 * * * * * * address: changsha city * * * * * * * * * * * * consultation: The Notice of the Ministry of Natural Resources on the Release of the "Industrial Project Construction Land Control Indicators" (Natural Resources [2023] No. 72) stipulates that the research and development, design, testing and pilot test facilities necessary for industrial production in industrial projects can be calculated in addition to administrative office and living service facilities, and the construction area is less than 15% of the total construction area of industrial projects. Does the same apply to industrial real estate type projects? Reply: Hello! The project types in the "Industrial Project construction land Control Indicators" are mainly for the manufacturing industry, and it is clear that "industry classification is implemented in accordance with the manufacturing industry classification of the National Economy" (GB/T 4754). For details, please consult local natural resources authorities and relevant departments. (Division of Natural Resources Development and Utilization) 2024-02-27 16:35:10
Quick entry
党政机关标识
Sitemap - About this Site - Use Help - Contact Us - Site Survey Sponsor: Ministry of Natural Resources of the People's Republic of ChinaHosted by: Information Centre, Ministry of Natural ResourcesCopyright: Ministry of Natural Resources, People's Republic of China Government website ID: bm16000001Beijing ICP prepared 18044900-1

Beijing public network security 11010202007799


It is recommended to use Internet Explorer 9.0 or above browser or compatible browser, resolution 1280*720