Qinhuangdao Olympic Sports Center Stadium

One of the venues of the 2008 Beijing Olympic Games
Qinhuangdao Olympic Sports Center is 2008 Beijing Olympic Games One of the sub-venues, Qinhuangdao Stadium is one of the main buildings of the Olympic Sports Center. It is located in... Qinhuangdao city southwestern Harbour area It is a functional stadium. 2016 season Chinese Super League Hebei China Fortune Football team The home field will be set here, Qinhuangdao Olympic Sports Center has also been the second team Hebei Elite Football Club Home court. [1]
Qinhuangdao Olympic Sports Center Stadium covers an area of 168,700 square meters, construction area of 41,800 square meters, with international standards 104 meters long, 68 meters wide Artificial turf Football field and 400m track track. With a capacity of 35,000 spectators, it was completed and put into use in August 2004, and was the first new venue to be started and completed among the venues for the 2008 Beijing Olympic Games.
Chinese name
Qinhuangdao Olympic Sports Center Stadium
Foreign name
Qinhuangdao Olympic Center Stadium
Geographical position
West section, Hebei Street, Haigang District, Qinhuangdao
Occupation of territory
556.78 acres
seat
33,000
capacity
35000
Building scale
48,000 ㎡
Home country
China
Home city
Qinhuangdao City, Hebei Province
Good season for play
Suitable for all seasons

intro

broadcast
EDITOR
习近平总书记视察秦皇岛奥体中心
The stadium is located Hebei (Province) street-level Qinhuangdao Olympic Sports Center It covers an area of 556.78 mu, including stadiums, gymnasiums, sports schools, sports hotels, supermarkets and other multi-functional supporting facilities, with an estimated total investment of 1.085 billion yuan. Act as Beijing Olympic Games The football stadium project broke ground in May 2002, the main building is six stories, with a 400-meter standard track and a football field that can meet the international competition, and can accommodate 33,000 spectators. It is expected to be operational by May 2004, thus becoming Beijing Olympic Venues The first project started and completed in China. [2]
Building size: 48,000 square meters
Location: Qinhuangdao Sports Center, Hebei Street, Qinhuangdao City

General situation

broadcast
EDITOR
Qinhuangdao Olympic Sports Center Stadium
Stadium auditorium oval and oval Center line The east and west stands are 15 metres apart so that the west stand with better line-of-sight quality can accommodate more spectators. The stands have a total of 33,000 seats, of which 2‰ are disabled seats.
There are also boxes at the back of the east and west stands. The stadium has a standard track and field with a 400-meter circular track with a radius of 36.5 meters, and a 104m×68m natural turf football field is set inside the track.
The west stand is a two-storey stand, with boxes at the back of the east and west stands. The stadium is equipped with a standard track and field with a 400-meter circular track with a radius of 36.5 meters, and a 104mx68m natural turf football field is set inside the track. The ground floor of the West stand is composed of rooms for athletes, referees, organizing committee, journalists, press center, etc. All the outer walls along the track and field are floor-to-ceiling glass, which can give you a panoramic view of the track and field; Eight sets of athletes' rooms with shower and toilet, which can meet the requirements of international competitions, medical room, Doping control Room, post-match control center, etc. can provide services for various competitions, in addition, the ground floor also has a large conference room, press conference center, TV relay technology room, office, fire control center room. The ground floor of the east stand has a mass sports and entertainment room and a tennis club, and a large and small restaurant, the sports lawn inside the stadium and the background of the stand become an excellent visual environment for the restaurant. The bottom floor of the north and south stands is mainly auxiliary rooms, the south stand is equipped with offices and sports equipment storage, and the north stand is equipped with 22 double rooms for athletes and corresponding coffee bars and entertainment multi-function rooms.
Qinhuangdao Olympic Sports Center Stadium
The cantilever roof of the stand of Qinhuangdao Stadium adopts 24 concrete columns with steel columns and suspension cables Steel truss The combination structure. roof The horizontal projection is an ellipse of 246m on the long axis (east-west) and 230m on the short axis (North-South). The whole membrane roof is composed of 24 basic tension units. The back of each basic tension unit is stretched by side cables, the leading edge is fixed on the steel arch of the inner ring beam, and the two sides are fixed on the steel truss The upper chord, the unit truss is supported by the steel arch, the unit suspension truss through the front tie rod, the front cable, the back tie rod and the lower tie rod overhang in Reinforced concrete On the uprights. The maximum overhanging span of the steel truss is 50m. The stadium's 24 cantilever steel trusses passed Chordal membrane Steel arch, inside and outside Ring beam The front and back cables (rods) are combined into a clear and reasonable force space structure system. Looking up from the infield, the whole canopy roof, the structural rods are clear and uniform structure system, simple and reasonable, abandoning the previous stadium steel roof The poor visual image of the bar is complicated, and the whole roof has reasonable force, but it gives people a light and elegant visual beauty.

Site selection

broadcast
EDITOR
Qinhuangdao Olympic Sports Center Stadium
As the football sub-stadium of the 2008 Beijing Olympic Games, Qinhuangdao District welcomed a super heavyweight on February 3, 2008 - the vice president of FIFA Chung Mong-joon The FIFA investigation team led by him and the accompanying staff of the Olympic Organizing Committee made a one-day inspection of the work of the Qin Olympic Games and gave it a high degree of affirmation.
The delegation inspected the football training center of the development zone and the training field of the Olympic Sports Center, etc. Officials carefully asked and recorded the area of the field, lighting, detailed to the specific Settings of toilets and changing rooms, especially concerned about the work rooms of media reporters during the game.
In the audience of the Olympic Sports Center stadium, Chung Mong-joon was surprised to find that there is a view of the sea, and praised the location of the stadium is very good, because it is the most beautiful stadium in the world. In the face of the media, Chung Mong-joon praised the Qinhuangdao stadium although the completion time is not long, but the advanced facilities and novel design, the completion of the Olympic Games without any problems.

complete

broadcast
EDITOR
Qinhuangdao Olympic Sports Center Stadium
Learned from Qinhuangdao Olympic Games Office, as 2008 Beijing Olympic Games Football field, Qinhuangdao competition area Training venue The supporting renovation project of the Olympic Sports Center has entered the final stage, the main project is basically completed, and the transformation of the lighting of the two training venues of the Olympic Sports Center and the supporting construction project of the athletes' lounge has been completed.
In accordance with Beijing Organizing Committee for the Olympic Games Under the unified arrangement, Qinhuangdao Zone will host 12 preliminary matches of the football tournament. Since 2007, Qinhuangdao competition zone against the Olympic Sports Center stadium and Qinhuangdao Campus of Northeastern University The auxiliary facilities such as turf, lights and athletes' lounge of the three alternate competition and training venues in the Forest Park of the Development Zone and Qinhuangdao Foreign Language Vocational College have been further renovated. In the first quarter of this year, the competition area continued to refine and improve the Olympic venues, and the equipment and facilities of the competition and training venues were purchased The year 2008 By the end of April, all the new construction, renovation and functional improvement of the competition arena and training ground were completed by the end of May 2008.

Venue milestone

broadcast
EDITOR
Delivery date: 2008 The 30th of March

The air Mask ice hockey arena

broadcast
EDITOR
Ice hockey arena
Air film Ice hockey Arena is located in the north of Qinhuangdao Olympic Sports Center. The project is divided into two functional areas: ice hockey arena and comprehensive arena. The ice hockey arena covers an area of about 3000 square meters, and the comprehensive arena covers an area of about 2500 square meters. Among them, the ice hockey arena includes 1,830 square meters of standard ice rink and 450 seats stand, which is in line with the World Ice Federation standards of the event level ice rink.
Compared with the ice and snow venues with ordinary building structures, the high-strength anti-aging gas film gives the air film venue many unique advantages, and the people of Qinhuangdao have a venue that can participate in ice and snow sports all seasons. [3]