Shenyang Olympic Sports Center

A sports center in Shenyang, Liaoning province
Collect
Check out my collection
0 Useful +1
0
Shenyang Olympic Sports Center, referred to as "Shenyang Olympic Sports Center", is a sports center located in Shenyang, Liaoning Province. The whole project is divided into "one game, three halls" layout, "one game" for the main stadium can accommodate 60,000 people; The "three halls" are a comprehensive gymnasium with a capacity of 10,000 people, a swimming pool with a capacity of 4,000 people and a tennis hall with a capacity of 4,000 people. [8]
With the demolition of Wulihe Stadium and Liaoning Stadium, the Olympic Sports Center, as the only large sports competition venue in Shenyang, has become a new landmark building in Shenyang. [8]
Chinese name
Shenyang Olympic Sports Center
Foreign name
Shenyang Olympic Sports Center
site
12 Yingpan Road, Hunnan District, Shenyang City, Liaoning Province
distribution
Three halls at a time
Floor area
296,999 square meters (including 140,000 square meters in the main stadium)
capacity
60,000 people
Hold an event
The 2008 Beijing Olympic Games football competition, the opening ceremony of the 12th Olympic Games and track and field competitions
Traffic facilities
Shenyang Subway Line 2 and 9, Shenyang Tram Line 1 and 2

Venue location

broadcast
EDITOR
Shenyang Olympic Sports Center was built in Hunnan District, Shenyang City, Liaoning Province, the central coordinates are 123°27 '22 "east longitude, 41°44' 13" north latitude, location range: west of Fumin Street, east of Hunhe Street, north of Hunnan Avenue, planning roads Hunnan No. 4 Road, Hunnan No. 5 road south.
Shenyang Olympic Sports Center

Architectural design

broadcast
EDITOR
The planned construction area is 54.59 hectares (42.95 hectares within the red line), with a total construction area of 296,99 square meters.
Shenyang Olympic Sports Center
Among them: a stadium with a capacity of 60,000 people (underground Structural layer 6 floors above ground, including meet FIFA (International Football Association) A standard natural turf football match field with a standard plastic track and track and field competition function and a natural turf football warm-up training field with a standard plastic track, with various buildings of 1-6 floors 138,888 square meters);
A gymnasium with a capacity of 10,000 people (main gymnasium and training hall, underground Structural layer 4 floors on the ground, including indoor ball games, gymnastics, ice sports venues and training grounds, 1-4 floors of various buildings 50,570 square meters);
A swimming pool that can accommodate 4,000 people (underground structure floor, 3 floors above ground, including indoor water sports swimming, Synchronized swimming , Platform diving , Springboard diving , Water polo Competition and training ground, 1-3 floors of various buildings about 37,100 square meters);
A tennis hall that can accommodate 4,000 people (underground structure floor, 2 floors above ground, including a No. 1 indoor court that can accommodate 4,000 people, and three outdoor No. 2 and No. 3 outdoor courts and training courts that can accommodate 2,000 people each, and about 14,700 square meters of various buildings with 1-2 floors); 15,770 square meters of air cloisters on the second floor, 19,280 square meters of main access platform on the second floor, 90,300 square meters of indoor parking buildings under the stadium, 11,900 square meters of indoor parking buildings under the swimming pool and tennis hall, 11,900 square meters of administrative management, business office and logistics rooms, The construction area of general equipment rooms and other public Spaces is included in the total construction area of 296,999 square meters; A total of 2,520 vehicles can be parked in the parking lot within the site (including 1,415 stadiums, 625 gymnasiums, 480 natatorium and tennis stadiums, including 500 buses), and 2,730 vehicles can be parked in the temporary parking lot outside the site (including: 730 units in the North block, 2000 units in the South block), a total of 5,250 vehicles of various types can be parked; The non-motor vehicle parking lot within the area can park 3,000 bicycles and 180 disabled vehicles.

Venue structure

broadcast
EDITOR
The stadium roof with its unique character of soft and soothing curves, like light wings falling from the sky onto the broad green hills, meets the artificial ground and harmonizes with the rich water and the green surrounding environment.
Stadium structure of Shenyang Olympic Sports Center
Designed with the concept of a crown of olive leaves awarded to the victor, the 300-meter-long large roof is made of glass and metal. Like a breathing skin, this roof ADAPTS to the changes of the climate in the four seasons, effectively regulating the influence of light, heat and wind, and creating an ideal competitive environment. This is consistent with the theme of combining nature and ecology in Shenyang's urban environment construction. This stadium with the most advanced high-tech technology will not only be a representative sports center in China, but also in the world.

Central building

broadcast
EDITOR

stadium

From the appearance, the main stadium is like a crystal crown in the hands of the Goddess of Victory, while the three indoor venues in the east and west direction are like a pair of wings of the Goddess of victory. The relevant person in charge of Shenyang Municipal Planning Bureau thus interprets the design concept of the Olympic Sports center.
It consists of two structural bodies, with the grandstand section adopted Reinforced concrete structure The roof adopts the arch steel structure, the arch roof is composed of 6 pieces of steel structure, and the east and west are divided into 3 pieces, such a structural layout not only reduces the difficulty of construction, but also makes the appearance of the venue form a streamlined effect.
In the design of the main stadium, the main stadium of the Olympic Sports Center has applied many international popular ideas. In the 6 arch film, there is a certain gap between each two, which not only ensures the air circulation in the venue, but also effectively avoids the problem of echo in other large venues and the audience cannot hear the broadcast. Remarkably, the main stadium roof is fully used Solar panel Transparent materials, such as glass, make the lawn in the field fully enjoy the sun exposure, improve the maintenance cycle of the lawn. In addition, the main stadium of the Olympic Sports Center will break the three-tier stand pattern of most venues and adopt a two-tier stand structure.
The line of sight of the third tier stands is very steep, the audience sitting on the third tier to watch the game is very inhuman, compared with the two tier stands are much more comfortable, in addition, there are 100 VIP boxes specially set up between the first and second tier stands to welcome the arrival of domestic and foreign dignitaries.

gymnasium

Sports complex
The gymnasium has three floors Reinforced concrete Frame structure The grandstand is divided into the second floor of the high and low area, and the second floor of the middle building of the western part of the competition hall is used as a private room. The roof of the grandstand is steel structure bearing system and metal plate covering surface. The warm-up training hall is located on the east side of the competition hall, mainly for athletes to warm up training and Liaoning Sports Bureau Each training brigade training use.

natatorium

The swimming pool is equipped with a swimming competition pool, a diving pool and a swimming training pool.
① The swimming competition pool is 50m long and 25m wide, with 10 lanes, starting platforms at both ends, and lane hooks at the end of the pool. Two ladders are set on both sides of the pool, and stainless steel handrails are set on the pool bank. The swimming pool can meet the synchronized swimming and water polo competitions, and the men's and women's hand goals are installed in the overflow tank on the bank of the pool.
② The diving pool is 25m long, 21m wide and 6m deep. One side of the diving pool is equipped with 1m, 3m, 5m, 7.5m and 10m diving platforms. The other side of the diving pool is equipped with two 0.75m springboards, three 1m springboards and four 3m springboards.
③ The training pool is 50m long and 25m wide, with 10 swimming lanes and starting platforms at both ends. In order to meet the 25m swimming training, 18 25m lanes are set horizontally in the pool, and 50m and 25m lane hooks are set respectively. Two ladders are set on both sides of the pool, and stainless steel handrails are set on the pool bank.

Tennis arena

A standard tennis court is set up in the tennis hall, which can be used for tennis finals. The straight-inserted tennis posts are set up, the tennis posts are embedded in the court and the tennis court surface is laid with acrylic tennis court special surface layer. The tennis stadium uses the roof space of the room to set up an air training track and lay a 9㎜ thick rubber track. In order to improve the utilization rate of the tennis hall, the court can be used as a comprehensive gymnasium when the wooden floor is laid in the court, and the court can be used for indoor sports such as basketball, volleyball (the court is equipped with a straight insert volleyball pole and hole), badminton, and table tennis.
The tennis training hall is equipped with 10 pieces of tennis training court, the surface layer of the court is acrylic tennis court special material, set up a straight insert tennis post.
A total of 12 tennis courts are set up outside, of which 2 are for semi-finals and 10 are for training. The surface layer of the court is acrylic tennis court special material, and a straight insert tennis column is set.

function

broadcast
EDITOR
Shenyang Olympic Sports Center
"The construction of Shenyang Olympic Sports Center is based on meeting the sports technology as the basic starting point, has reached the national and international first-class stadium acceptance standards, is comparable to the 'Bird's Nest' quality project." This is May 28, the State Administration of Work safety and General Administration of Sports expert group to Shenyang Olympic Sports Center highly appraised. On the same day, the Shenyang Olympic Sports Center passed the last and highest level of safety inspection, becoming the first sports venue in China to conduct safety evaluation.
Welcome the examiner
On May 28, 2008, State Administration of Work Safety The State General Administration of Sport and other relevant leaders Beijing Architectural Design and Research Institute , Northeastern University Experts from Shanghai Construction Design and Research Institute gathered in Shenyang for the final acceptance of the safety facilities of the Shenyang Olympic Sports Center after completion. Expert group announced: Shenyang Olympic Sports Center engineering safety facilities completed acceptance successfully passed. Chen Jianzhi, director of Shenyang Work Supervision Bureau, said: "This is the highest level of safety inspection in China, and the Olympic Sports Center is also the first sports venue in China to conduct this safety evaluation. The acceptance is passed, which proves that the acceptance of the Olympic Sports Center has been completed, and the security of all its links has been demonstrated."
Officials from the General Administration of Sport also said that the Shenyang Olympic Sports Center is the first sports venue in China to undergo safety evaluation, and the project will contribute to the construction of domestic sports venues in the future.
Like a bird's nest
At the evaluation meeting, responsible for construction China Construction First (Group) Co., LTD Project manager Zhang Bingcheng Said that sports craft is the soul of the stadium. Sports technology has extremely high requirements for the flatness and slope dimension accuracy, lighting, sound, LED display, timing and scoring system. The construction of Shenyang Olympic Sports Center is based on meeting the sports technology, and has reached the acceptance standards of national and international first-class stadiums.
Zhang Bingcheng introduced, the Olympic sports center applied Moc (Ministry of Construction) Among the 10 categories of new technologies in the "10 new Technologies in the construction industry" promoted, 3 technical achievements have reached the international leading level as a whole. In addition to the innovative design of "360 meters single span without support in the middle. Pipe truss awning Steel installation In addition to the process, there is "36000KN horizontal thrust steel structure. Main arch Irregular pentagonal pyramid Mass concrete Construction "and" Large diameter steel pipe Cold bending processing technology, etc., has also reached the international leading level, and some processes have also filled the national gap. To this end, the Olympic Sports Center has been praised by domestic steel structure experts as a quality project comparable to the "Bird's Nest".
The "Crystal Crown" Shenyang Olympic Sports Center will host 12 football matches during the Beijing Olympics. The FIFA investigation team will conduct a comprehensive investigation into the preparation of the Shenyang competition area, which will also be the most thorough "test" of the highest specifications faced by the "Crystal Crown" since its completion.
January 29, 2008 International Olympic Committee Chairman of the Coordinating Committee Verbruggen The difference in visiting Shenyang alone is that FIFA this time formed a delegation of up to 11 people, the vice president of FIFA Chung Mong-joon Personally lead the team, including FIFA Senior Tournament managers, FIFA Competition officials, FIFA Press officers, FIFA IT Technical Officers, etc. Meanwhile, Beijing Organizing Committee for the Olympic Games Also by the Minister of sports Zhang Jilong Led the team, formed a team of 11 people to accompany the whole visit.
On the morning of February 1, 2008, the FIFA delegation will listen to the work report of the Shenyang Olympic Games Office, and in the afternoon the delegation will be divided into four groups, respectively, the official reception hotel, stadium, media reception, security and other aspects of the situation of the comprehensive on-site understanding.
According to reports, the first stop of the FIFA delegation visited Shanghai, and inspected the VIP area, the referees' lounge, the athletes' lounge, the stadium. Doping testing center The news center, the mixed interview area, etc., were carefully investigated, and a few rooms, a few chairs in the room, and a few washbasins were carefully questioned.
On April 29, 2008, in order to beauish the surrounding environment of the Olympic Sports Center, 10 boulevards have been built around the Olympic Sports Center, with a total green area of about 55 hectares, pavement and non-motorized lanes of about 120,000 square meters, and about 250,000 trees have been planted, with a total investment of about 120 million yuan.
In order to beautify the surrounding environment of Shenyang Olympic Sports Center, Hunnan New District, where the Olympic Sports Center is located, began to greening its surrounding roads from the autumn of 2007, and now all 10 main roads around the Olympic Sports Center have been greening. The spring breeze is blowing, and the new trees are spitting green, which makes the silver and white buildings of the Olympic Sports Center more beautiful. By June 30, the paving of the 10 streets will be completed.

Performance competition

broadcast
EDITOR
Performance competition
time
performance
August 27, 2011
Jay Chou super time Shenyang concert [1]
July 12, 2014
Wang Feng 2014 "Peak Storm Coming" super tour concert Shenyang station [2]
May 11, 2019
JJ Jj Lin Junjie "Sanctuary" 2.0 Tour concert - Shenyang Station [3]
June 15, 2019
Zhang Jiewei LIVE concert tour -- Shenyang Railway Station [4]
May 13, 2023
Li Ronghao "The Four Seas" tour concert - Shenyang station
June 2-3, 2023
Zhang Jie Wei ·LIVE - "Yao · Beidou" tour concert -- Shenyang Railway Station [6]
July 14-17, 2023
Mayday "I really want to see you" tour concert - Shenyang Station [7]
July 29, 2023
Angela Chang Fables World Tour Concert -- Shenyang Station
August 23, 2023
Hua Liu Yin Xiong concert
September 2-3, 2023
Xue Zhiqian "Heaven Foreign Things" Tour concert - Shenyang Station
张杰沈阳奥体中心演唱会 张杰沈阳奥体中心演唱会 张杰沈阳奥体中心演唱会 张杰沈阳奥体中心演唱会 张杰沈阳奥体中心演唱会 张杰沈阳奥体中心演唱会
Zhang Jie's concert at Shenyang Olympic Sports Center

Honor received

broadcast
EDITOR
In December 2019, it won the title of "2015-2018 National Advanced Unit of Disabled Sports". [5]