Hanghuang high-speed railway

China Hangzhou-Huangshan high-speed railway
Collect
Check out my collection
0 Useful +1
0
synonymHanghuang high-speed railway(Hanghuang High-speed Railway) generally refers to the Hanghuang high-speed railway
The Hangzhou-Huangshan High-speed Railway, i.e Hangzhou-chang high-speed railway Hang-huang section, referred to as Hang-Huang high-speed Railway, also known as Hang-Huang Passenger Line, is a connection Zhejiang Province Hangzhou City with Anhui Province Huangshan City The high speed rail. [1]
On June 30, 2014, the construction of Hanghuang high-speed Railway officially started; [2] On March 12, 2018, the entire track project was completed. On September 11, 2018, the joint test began; [3] On December 25, 2018, it was officially opened for operation. [4]
Hanghuang high-speed railway since Hangzhou East Railway Station to Huangshan North Railway Station It has a total length of 287 km and 10 stations, with a design speed of 250 km/h and an operating speed of 250 km/h. [5]
Chinese name
Hanghuang high-speed railway
Foreign name
Hangzhou-Huangshan High-speed Railway
Opening date
December 25, 2018
Line length
287 km
Design speed
250 km/h
Operating speed
250 km/h
Railway class
High-speed railway
Start-stop station
Hangzhou East Station - Huangshan North Station
alias
Hanghuang passenger line
Number of stations
ten
Via provinces and cities
Zhejiang Province, Anhui Province
Cities along the route
Hangzhou, Xuancheng City, Huangshan City

Historical evolution

broadcast
EDITOR
In July 2010, the "New Hangzhou to Huangshan Railway Project Proposal" was approved by the Development and Reform Commission of the People's Republic of China. [6]
In January 2014, the "Hangzhou to Huangshan Railway Feasibility Study Report" was approved by the Development and Reform Commission of the People's Republic of China; [7] On June 30 of the same year, the construction of Hanghuang high-speed Railway started in advance; [2] In September of the same year, the construction of the Hanghuang high-speed railway began. [8]
On December 8, 2016, the Tianmushan Tunnel of the Hangzhou-Huanghuang high-speed Railway with a length of 12.013 kilometers was completed. [9]
On March 8, 2017, the first pair of long steel rails of the Hanghuang high-speed railway line were laid at Huangshan North Station; [9] On April 12 of the same year, the 9,087 meter Fenggaoling Tunnel of Hanghuang High-speed Railway was completed. [9] On August 10 of the same year, the Shiniushan Tunnel, the last double-track tunnel of the Hang-Huang high-speed Railway, was officially opened, marking the completion of 87 mountain tunnels (a total of 140 kilometers) of the Hang-Huang high-speed Railway. [9] On November 14 of the same year, the Han-Huang high-speed Railway Chuanfang large bridge beam project was completed, marking the completion of the main line project of the Hang-Huang high-speed railway. [9]
On March 12, 2018, the track of Hanghuang high-speed Railway was laid through; On July 25 of the same year, Hanghuang high-speed Railway entered the static acceptance stage; [10] On September 11 of the same year, Hangzhou-Huanghuang high-speed railway began joint testing; [3] On November 4 of the same year, the Hanghuang high-speed railway joint adjustment and joint test was completed; [11] On November 11 of the same year, Hanghuang high-speed Railway started train diagram parameter testing; [12] On December 25 of the same year, Hang-Huang high-speed Railway was officially put into operation, becoming the Hang-Huang section of Hang-Chang High-speed Railway. [4]
Along the Hanghuang high-speed railway

Line station

broadcast
EDITOR

Design parameter

Technical standard
Railway class
High-speed railway
Number of positive lines
doublet
Design speed
250 km/h
Minimum curve radius
4000 meters, 3,500 meters in a difficult area
Type of traction
electricity
Effective length of arrival and departure line
650 m
Restricted grade
20 ‰
Train operation mode
Automatic control
Traffic control mode
Centralized scheduling
Reference materials: [5]

Station along line

Serial number
Station name
Mileage (km)
Station location
Subordinate unit
1
0
2
15
Zhejiang Province Hangzhou City Xiaoshan District 328 Zhanqian Road
3
60
Zhejiang Province Hangzhou City Fuyang District Chunjiang street Jianhua natural village
4
98
Zhejiang Province Hangzhou City Tonglu county Chengnan Street Dongxing village Jiang Lujia natural village
5
137
Zhejiang Province Hangzhou City Jiande City Yangcun bridge town catalpa source village
6
168
Zhejiang Province Hangzhou City Chun 'an County Wenchang town Wenchang village north
7
217
8
245
Anhui Province Xuancheng City Jixi county Flower root
9
269
Anhui Province Huangshan City Shexian County (in Anhui Province) Fu 堨 town Chengshi village north
10
287
Anhui Province Huangshan City Tunxi District No. 2 North Pine Avenue
Reference materials: [13]

Line trend

The main line of Hanghuang high-speed railway is from Hangzhou railway hub Hangzhou South Railway Station leads, by Fuyang Trailing edge Fuchun River South bank to Tonglu County After crossing the Fuchun River, Jing Jiande , Chun 'an To the northwest through Anhui Jixi county To Huangshan North Station, a total length of 287 kilometers, 208 kilometers in Zhejiang Province, 80 kilometers in Anhui province. [1] [5]

Equipment and facilities

broadcast
EDITOR

Vehicle facility

Part of the Hanghuang high-speed railway adopts CR400BF-A "Fuxing" train, the train is China's standard EMU train, the top speed can reach 400 km/h and above, the use of "golden Phoenix" color, 16 knots long formation, a total of 1193 seats. [4]

Operating system

Hanghuang high-speed Railway adopts the CTCS-3 new train operation control system, which enables the high-speed railway to collect a variety of data in the driving immediately to assist the driver to drive safely, realize computer integration and information control, and make the digital "signal light" replace the traditional signal light in the state of high-speed driving more accurate and feasible. [15 to 16]

Construction achievement

broadcast
EDITOR

Technical problem

The Hanghuang high-speed railway passes through a large number of areas such as poor geological zones, water-rich fracture zones and extremely high ground stresses, and the geological conditions are complicated. [17]

Key project

  • Tianmushan Tunnel
Tianmushan Tunnel
Tianmushan Tunnel Located at the junction of Zhejiang and Anhui provinces, it starts from Jinling Village, Linqi Town, Chun 'an, Zhejiang Province, and ends at Chaceng Village, Sanyang Town, Shexian County, Anhui Province. With a total length of 12.013 kilometers, it is the longest tunnel of Hang-Huang high-speed Railway and the longest railway tunnel that has been broken through in the Yangtze River Delta region. The tunnel is classified as a Grade I high-risk tunnel. On December 8, 2016, the Tianmushan Tunnel was officially completed. [17]
  • Shiniu Mountain Tunnel
Shiniushan Tunnel is the last double-track tunnel of Hanghuang high-speed Railway, located in the territory of Hangzhou, starting from Xiaoshan District of Hangzhou and ending in Fuyang District of Hangzhou, with a total length of 4.1 kilometers, it is the last double-track tunnel of Hanghuang high-speed Railway. The entrance of Shiniushan Tunnel is an uphill cave, which is difficult to construct due to high temperature and high humidity, and belongs to the key project along the Hanghuang high-speed railway. On August 10, 2017, the Shiniushan Tunnel was officially opened, marking the completion of 86 mountain tunnels (a total of 140 kilometers) on the entire line of the Hang-Huang high-speed railway. [17]
  • Chuanfang Bridge
Chuanfang Bridge
Chuanfang Bridge is the longest bridge in the whole line of Hanghuang-Huang High-speed railway. It is located in Suoqian Town, Xiaoshan, Hangzhou. The right bridge is 1117.76 meters long, and the left bridge is 2353.3 meters long. It is close to the high-speed railway line, and the distance between the bridge and the existing Shanghai-Kunming high-speed railway is only 2.4 meters; The adjacent construction line is long, with 30 piers close to the Shanghai-Kunming high-speed railway; The geology is complex and varied. On November 14, 2017, the beam construction of Chuanfang Large Bridge was completed. [18]

Honor received

In December 2021, the new Hangzhou to Huangshan Railway comprehensive project won the "2020-2021 National Quality Project Award". [20]

Value meaning

broadcast
EDITOR
The opening and operation of Hanghuang high-speed Railway has ended the history of high-speed railway in the west of Zhejiang, which is of great significance to improve the travel conditions of the masses along the line and optimize and perfect the layout of the regional fast road network. At the same time, the line connects Hangzhou, Fuchun River, Qiandao Lake, Huangshan and other famous cities, rivers, lakes and mountains, helping to promote the development of tourism along the line and promote the coordinated development of regional economy. (Chinese government website review) [3]
The Hanghuang high-speed railway runs through Zhejiang and Anhui provinces Yangtze River Delta intercity railway network Along the way, the famous city (Hangzhou), the famous river (Fuchun River, Xin 'an River), the famous lake (Qianddao Lake), the famous mountain (Huangshan) are linked together to form a world-class golden tourism channel, which is conducive to the integration of tourism resources and the strengthening of the economic radiation of the Yangtze River Delta. At the same time, the line connects Fuyang, Tonglu, Jiande, Chun 'an, and wins opportunities for the trans-development of the western part of Hangzhou. (Anhui net review) [19]

Operation condition

broadcast
EDITOR
  • Operation history
From December 25, 2018, Hanghuang High-speed Railway opened 11 pairs of trains within China Railway Shanghai Bureau Group Co., LTD.
From January 5, 2019, the Hang-Huang High-speed Railway will operate 36 pairs of EMU trains, including 33 pairs of daily lines, 1 pair of weekend lines and 2 pairs of peak lines. [4]
  • Passenger flow
  • On April 3, 2019, the Hang-Huang high-speed Railway opened for 100 days of operation, and safely transported more than 1.5 million passengers [14]